My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
12/17/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:38:46 PM
Creation date
5/18/2020 2:36:05 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/17/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Wabasso Sewer Phase 2 <br />Attachement 1 <br />CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />West Wabasso Sewer Phase 2 <br />UCP #4117 BID NO. 2019-020 <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Price Increase <br />Price Decrease <br />11 <br />4" O Force Main Directional Bore (DR -11 HDPE) <br />80 <br />LF, <br />$ 134.94 <br />$ 10,795.20 <br />13 <br />*Abandon 4" O Force Main in IRC R/W (Flush & Grout) <br />500 <br />LF <br />$ 10.13 <br />$ 5,065.00 <br />36 <br />Force Account <br />1 <br />LS <br />$ 75,000.00 <br />$ 75,000.00 <br />WCD 1 <br />Debris Removal <br />1 <br />LS <br />$ 12,574.54 <br />$ 12,574.54 <br />WCD 2 <br />Add 4" PVC Forcemain per Item 12 <br />292 <br />If <br />$ 30.42 <br />$ 8,882.64 <br />WCD 3 <br />Add 18" Riser to LS Wet Well <br />1 <br />LS <br />$ 6,200.80 <br />$ 6,200.80 <br />WCD 4 <br />18-12054 Sanitary Lateral at Community Center <br />1 <br />LS <br />$ 7,388.03 <br />$ 7,388.03 <br />WCD 5 <br />18-12055 Construct Water Service <br />1 <br />LS <br />$ 1,180.46 <br />$ 1,180.46 <br />WCD 6 <br />18-12056 Adjust Manhole Rims & Grade Open R/W <br />1 <br />LS <br />$ 17,874.70 <br />$ 17,874.70 <br />WCD 7 <br />18-12057 Construct Water Service & Time Ext. <br />1 <br />LS <br />$ 1,180.46 <br />$ 1,180.46 <br />WCD 8 <br />18-12058 Flowable Fill for Septic Tank Aband. <br />1 <br />LS <br />$ 10,025.69 <br />$ 10,025.69 <br />WCD 9 <br />18-12059 Additional Survey (Lot Corners) <br />1 <br />LS <br />$ 517.50 <br />$ 517.50 <br />Price Increase <br />Price Decrease <br />Subtotals: <br />$ 65,824.82 <br />$ 90,860.20 <br />TOTAL (Increase - Decrease): <br />$ (2 5,035.38) <br />207 <br />1 <br />FAUtilities\UTILITY - Engineering\Projects -Utility Construction Permits\IRC -West Wabasso Community Sewer System Phase 2 - UCP# 411AAdmin\BCC Items\Final Pay\2019-020 Final <br />Change Order <br />
The URL can be used to link to this page
Your browser does not support the video tag.