Laserfiche WebLink
Exhibit B <br />MAN-HOUR ESTIMATE FOR PROPOSED PROFESSIONAL SERVICES <br />Project Name: <br />IRC Jones Pier Historic Residence <br />DAA Project No.: <br />2018.23.003.1.2 <br />Date: <br />4/22/2020 <br />PRINCIPAL SR. PROJECT ENGINEER <br />MANAGER <br />CADTECH.1 <br />ENG./CAD ENG.TECH ADMIN. <br />TECH. ASSISTANT <br />TASK/DESCRIPITION <br />$175.00 $150.00 $125.00 <br />$100.00 <br />$75.00 $60.00 $55.00 <br />TOTAL <br />I. SCHEMATIC DESIGN <br />- -- _--- ---- <br />- ---- <br />Architecture - Elevations <br />1.00 <br />4.00 <br />$575.00 <br />Structure <br />MEP <br />--_. ---- <br />$0.00 <br />$0.00 <br />Cost Estimate <br />$0.00 <br />Technology <br />-- - - -_.--- <br />-- <br />$0.00 <br />Life Cycle <br />Civil Preliminary Design <br />_ <br />$0.00 <br />$0.00 <br />Sub -total Task I DD <br />$575.00 <br />1. DESIGN DEVELOPMENT <br />Architecture <br />$0.00 <br />Structure <br />$0.00 <br />MEP <br />$0.00 <br />Cost Estimate <br />$0.00 <br />Technology <br />$0.00 <br />Life Cycle <br />$0.00 <br />Civil Design/Permitting <br />$0.00 <br />Sub -total Task I DD <br />$0.00 <br />II. CONSTRUCTION DOCUMENTS <br />Architecture -Site Plan Revsion <br />1.00 <br />_ <br />$100.00 <br />Structure - Revisions <br />LOO <br />2.00 <br />2.00 <br />$525.00 <br />MEP <br />$0.00 <br />Cost Estimate <br />$0.00 <br />Technology <br />$0.00 <br />Civil Final Design <br />$O.OD <br />Sub -total Task II CD <br />$625.00 <br />111. BIDDING <br />Architecture <br />$0.00 <br />Structure <br />$0.00 <br />MEP <br />$000 <br />Technology <br />$O.OD <br />Civil <br />$0.00 <br />Sub -total Task Ill Bidding <br />$0.00 <br />IV. CONSTRUCTION ADMINISTRATION <br />Architecture <br />$0.00 <br />Structure <br />$0.00 <br />MEP <br />$0.00 <br />Technology <br />$0.00 <br />Civil Construction Services <br />$0.00 <br />Civil Certification <br />$0.00 <br />Sub -total Task IV CA <br />$0.00 <br />TOTAL BASE FEES <br />$1.200.00 <br />Existing Condition survey <br />Design Development <br />$0.00 <br />Construction Documents <br />$0.00 <br />Construction Administration <br />$0.00 <br />Sub -total survey <br />$0.00 <br />Reimbursable Expense <br />$100.00 <br />$100.00 <br />TOTAL FEES FOR ALL SERVICES <br />$1,300.00 <br />EXHIBIT B <br />