My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:07:52 AM
Creation date
5/21/2020 11:54:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/19/2020
Control Number
2020-103
Agenda Item Number
8.H.
Entity Name
XGD Systems, Inc.
Subject
Jones Pier Wetland Restoration and Conservation
Improvements
Area
7770 Jungle Trail Vero, Beach, FL
Bid Number
2020017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARTER ASSOCIATES, INC. <br />CONSULTING ENGINEERS AND LAND SURVEYORS <br />1708 21x1 S'1'REE7' - VERO BEACH, FLORIDA 32960.3472 - 772.562.4191 - 772.562.7180 (FAX) <br />JOIIN IL BI.IIM, P.L., 11KINCIPAL <br />DAVID Ii LIJE9'IDE- I'.S.M.. PRINCIPAL <br />GEORGE A. SIMONS, P.E., PRINCIPAL. <br />PATRICK S. WALTHER. 1'.E.. PKINCIPAI <br />MARVIN L. CAR I'NR, P.S.M.. Conwhanl a, lire firm <br />DEAN F. L.IJ ,111k, P.E., e nr, C tmNullaal to the Him <br />May 8, 2020 <br />Ms. Elizabeth Powell <br />Assistant Director, Parks & Conservation Resources <br />Indian River County <br />550077 th Street <br />Vero Beach, Florida 32967 <br />Attachment 1 <br />FRANK S. CUC'CURESE, P.S.M. <br />CLIN'I'ON J. RAHIES,141:. <br />TYLER N. SPENCER, P.E. <br />RE: Jones Pier Wetland Restoration and Conservation Improvements <br />Change Order Description <br />Dear Beth: <br />Please see below a brief description of the attached change order items provided by the contractor, <br />XGD Systems LLC: <br />Change Order 001 <br />18A Bid plans by Architect did not provide for lighting in the restrooms but were added later <br />during the building permit approval process. <br />49A Statement on phase 1 drawings indicates all passing density tests shall be paid by the <br />County. <br />52A Phase 2 drawings provided for rip -rap rubble in bottom of north outfall ditch. Owner's <br />representatives revised this area to be stabilized with fiber mat and planted with native <br />grasses. The rip -rap rubble will be re -purposed on-site. <br />53A Add 60 lineal feet of rip -rap revetment along the north bank of the south ditch adjacent to <br />the parking lot entrance to stabilize ditch bank from adjacent stormwater runoff. <br />56A The existing grade transition from the rear yards of the homesites north of the north ditch <br />created a slope in the ditch bank that caused concerns for future erosion. The sloping along <br />with vegetation removal in this area made it necessary to shift the walking trail south to <br />allow more room to re -stabilize the ditch bank. <br />Sclvu��Fk)rid�l <br />_ SAI 5,�;« ��� � _ <br />P:N8-39 Jones P1MConsWcbACorres rWence1C0P1-2 Narrative.dom Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.