My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/03/2020
CBCC
>
Meetings
>
2020's
>
2020
>
03/03/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:17:55 PM
Creation date
5/26/2020 11:58:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/03/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
excess of 40 hours in the work week. <br />d. The requirements of 40 U.S.C. § 3704 are applicable to construction work and provide <br />that nolaborer or mechanic must be required to work in surroundings or under working <br />conditions which are unsanitary, hazardous or dangerous. These requirements do not <br />apply to the purchases of supplies or materials or articles ordinarily available on the <br />open market, or contracts for transportation or transmission of intel igence. <br />e. The regulation at 29 C.F.R. § 5.5(b) provides the required contract clause concerning <br />compliance with the Contract Work Hours and Safety Standards Act: <br />"Compliance with the Contract Work Hours and Safety Standards Act. <br />(1) Overtime requirements. No contractor or subcontractor contracting for any <br />part of the contract work which may require or involve the employment of <br />aborers or mechanics shal require or permit any such laborer or mechanic in <br />any workweek in which he or she is employed on such work to work in excess <br />of forty hours in such workweek unless such laborer or mechanic receives <br />compensation at a rate not less than one and one-half times the basic rate of <br />pay for al hours worked in excess of forty hours in such workweek. <br />(2) Violation; iability for unpaid wages; iquidated damages. In the event of <br />any violation of the clause set forth in paragraph (1) of this section the <br />contractor and any subcontractor responsible therefor shal be liable for the <br />unpaid wages. In addition, such contractor and subcontractor shal be liable to <br />the United States (in the case of work done under contract for the District of <br />Columbia or a territory, to such District or to such territory), for liquidated <br />damages. Such liquidated damages shal be computed with respect to each <br />individual aborer or mechanic, including watchmen and guards, employed in <br />violation of the clause set forth in paragraph (1) of this section, in the sum of <br />$10 for each calendar day on which such individual was required or permitted <br />to work in excess of the standard workweek of forty hours without payment of <br />the overtime wages required by the clause set forth in paragraph (1) of this <br />section. <br />(3) Withholding for unpaid wages and iquidated damages. The (write in the <br />name of the Federal . agency or the oan or grant recipient) sha upon its own <br />action or upon written request of an authorized representative of the Department <br />of Labor withhold or cause to be withheld, from any moneys payable on account <br />of work performed by the contractor or subcontractor under any such contract <br />or any other Federa contract with the same prime contractor, or any other <br />federal y -assisted contract subject to the Contract Work Hours and Safety <br />Standards Act, which is held by the same prime contractor, such sums as may <br />be determined to be necessary to satisfy any liabilities of such contractor or <br />subcontractor for unpaid wages and liquidated damages as provided in the <br />clause set forth in paragraph (2) of this section. <br />(4) Subcontracts. The contractor or subcontractor shal insert in any <br />subcontracts the clauses set forth in paragraph (1) through (4) of this section <br />and also a clause requiring the subcontractors to include these clauses in <br />any lower tier subcontracts. The prime contractor shal be responsible for <br />compliance by any subcontractor or lower tier subcontractor with the clauses <br />set forth in paragraphs (1) through (4) of this section." <br />6. Rights to Inventions Made Under a Contract or Agreement <br />142 <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.