My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/03/2020
CBCC
>
Meetings
>
2020's
>
2020
>
03/03/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:17:55 PM
Creation date
5/26/2020 11:58:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/03/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
follow the schedule outlined below: <br />1. Off-site water main to be paid once completion of all necessary testing, acceptance of <br />Florida Department of Environmental Protection (FDEP) Certification of Completion, <br />and acceptance of the water main dedication to Indian River County Department of <br />Utility Services (IRCDUS) per (IRCDUS) Water & Wastewater Utility Standards, March <br />2019 or latest edition. <br />2. Paragraph 1.D. shall be added to read as follows: <br />D. The County and Developer acknowledge that additions to the Agreement will be <br />necessary when future phases are contemplated. The 12" off-site water main and the <br />6" force main on 69th Street will be extended to the western limits of Lost Tree <br />Preserve PD when future phases of the project are constructed. The County and the <br />Developer agree that the Developer will pay 67% of the construction costs of the water <br />main that abuts Developer property (Lost Tree Preserve PD) with the County <br />responsible for the 33% balance. The 6" force main on 69th Street will be extended to <br />the western limits of Lost Tree Preserve PD. The County and the Developer agree that <br />the Developer will pay 67% of the construction costs of the force main that abuts its <br />property with the County responsible for the 33% balance. The dollar value of these <br />future required improvements will be determined at the time the corresponding phase <br />of Lost Tree Preserve PD is proposed for construction. The payments and payment <br />schedule under this paragraph 1.D will be consistent with paragraph 1.A and 1.B to the <br />Agreement, as amended. <br />3. Exhibit "D" attached to this Amendment shall be incorporated into Agreement as Exhibit "D". <br />4. All other provisions of the Agreement shall remain in full force and effect. <br />-Page 2 - 72 <br />F:\UTILITIES\UTILITY - ENGINEERING\PROJECTS - UTILITY CONSTRUCTION PERMITS \65TH ST OFFSITE WATER MAIN (HIGH POINTE SUED) - UCP p 3480\DEVELOPERS AGREEMENT\AMENDMENT 2-I3- <br />2020DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.