Laserfiche WebLink
Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: February 18, 2020 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject: Amendment 1 to Work Order No. 7 Masteller & Moler, Inc. <br />8th Street 24" Force Main Relocation - FDOT Project 437717-1 <br />Background: <br />The Florida Department of Transportation (FDOT) is in the design phase of the replacement of the 8th <br />Street (CR 612) Bridge at 74th Avenue. The project will impact an existing Indian River County Department <br />of Utility Services (IRCDUS) sewer utility along the 8th Street right of way. The Board of County <br />Commissioners (BCC) approved Masteller & Moler, Inc. (MM) to prepare a utility relocation design on <br />November 5, 2019. In the performance of their scope of work, MM determined that additional permitting <br />will be required in order to relocate the sewer utility. See Amendment 1 to Work Order 7, attached. <br />Analysis:. <br />On April 17, 2018, the BCC approved the Continuing Contract Agreement for Professional Services with <br />MM. In accordance with that agreement, MM will provide additional professional services under <br />Amendment 1 to Work Order 7. <br />Funding: <br />Funds for this project are derived from utility operating capital funds. The utility operating fund budget <br />is derived from water and sewer revenues. <br />Description <br />Account Number <br />Amount <br />WO 7 - 8th Street 24" Forcemain Relocation <br />471-169000-20502 <br />$ 53,540.00 <br />MM Addendum 1 W07 <br />$ 5,320.00 <br />Total: <br />$58,860.00 <br />Recommendation: <br />Staff recommends the Board of -County -Commissioners approve Amendment 1 to Work Order No. 7 with <br />Masteller & Moler, Inc. for a lump sum amount of $5,320.00, and authorize the Chair to execute the <br />Amendment after review and approval from the County Attorney. <br />Attachments: <br />1. Amendment 1 to Work Order No. 7: Masteller & Moler, Inc. <br />75 <br />