My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-102
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:07:18 AM
Creation date
5/28/2020 12:34:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/19/2020
Control Number
2020-102
Agenda Item Number
8.E.
Entity Name
Vero Beach Medical Office Building, LLC
Subject
Agreement for Installation of Off-Site Sewer Mains
Area
3955 Indian River Boulevard Vero Beach, FL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C - Estimate of Constr4dion Cost <br />Vero Beach MOB Offsite Focemain <br />Bic: Item <br />No, <br />i3id Item Description <br />Estim ed <br />Qua <br />Unit of <br />Measure <br />Unit Price <br />Total Price <br />6" Forcemain <br />1 <br />6" PVC Forcemain (DR18) 475 If <br />$30.00 <br />$14,250.00 <br />2 <br />6" HDD (inc HDPE, Fusing, & Bentonite Removal) 310 If <br />$31.50 <br />$9,765.00 <br />3 <br />6" MJ Adaptor 2 ea <br />$600.00 <br />$1,200.00 <br />4 <br />6" Gate Valve w/ Cap & Restraints 1 ea <br />$2,000.00 <br />$2,000.00 <br />5 <br />4" HDD (inc HDPE, Fusing, & Bentonite Removal) 150 If <br />$25.50 <br />$3,825.00 <br />6 <br />4" MJ Adaptor 2 ea <br />$500.00 <br />$1,000.00 <br />7 <br />4" Gate Valve 1 ea <br />$1,156.10 <br />$1,156.10 <br />8 <br />HDD Contractor Mobilization 1 ea <br />$575.00 <br />$575.00 <br />Total Construction Cost: <br />$33,771.10 <br />IRCDUS Share (19%): <br />$6,416.51 <br />Developer's Share (81%): <br />$27,354.59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.