Laserfiche WebLink
2. Amendment: <br />This Agreement may be modified only by a written instrument executed by all parties to the <br />Agreement. <br />3. Assignability: <br />Either party may assign this Agreement so long as the assignment bears acknowledgment of <br />the assignee and the other party. However, the rights granted herein shall run with the land <br />and are not the personal property of the DEVELOPER. Therefore, while the DEVELOPER has the <br />right under this Agreement to freely transfer the rights and obligations granted by this <br />Agreement, the DEVELOPER, nor any assignee, shall have the right to transfer these rights to <br />another property unless this Agreement is amended in writing. <br />4. Authority: <br />Each party hereto represents and warrants to the other that the execution of this Agreement <br />and any other documents required or necessary to be executed pursuant to the provisions <br />hereof are valid, binding obligations and are enforceable in accordance with their terms. <br />5. Captions: <br />Captions, if included, in this Agreement are included for convenience only and are not to be <br />considered in any construction or interpretation of this Agreement or any of its provisions. <br />6. Construction Plans, Technical Specifications and Contract Documents: <br />The DEVELOPER agrees to complete a final set of construction drawings and make submission <br />for a Utilities Construction Permit (UCP) to IRCDUS, to Indian River County Public Works for a <br />Right -of -Way permit (ROW), which includes, but is not limited to meeting all security <br />requirements of section 312.11 of the Code, to the Florida Department of Environmental <br />Protection (FDEP) for a general permit, and for all other necessary permits. The DEVELOPER <br />shall not commence construction until all permits are approved and obtained. <br />7. Definition <br />All pronouns shall be deemed to refer to the masculine, feminine, or neuter, singular or plural, <br />as the identity of the party or parties may require. <br />8. DEVELOPER'S Obligations: <br />The design, preparation of contract documents, permitting, and construction of the Force Main <br />shall be the DEVELOPER's responsibility and expense until such time the necessary testing, <br />acceptance of the FDEP Certification Of Completion, and acceptance of the Force Main <br />dedication to IRCDUS per IRCDUS's Water & Wastewater Utility Standards, December 2019 or <br />latest edition, has been completed and 1 -year warranty is in place. <br />10. Entire Agreement <br />This Agreement embodies the entire agreement between the parties relative to the subject <br />matter hereof, and there are no oral or written agreements between the parties, nor any <br />Page 2 <br />