My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/07/2020
CBCC
>
Meetings
>
2020's
>
2020
>
04/07/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:37:24 PM
Creation date
6/1/2020 12:14:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/07/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Com. thco Inc. <br />Project Name: NORTH BERM MAINTENANCE PROJECT- SPOONBILL MARSH <br />Bid #:N/A <br />Opening Date: Wednesday, March 11, 2020 <br />Opening Location: <br />Indian River County Utilities <br />1801 27th Street <br />Vero Beach, FL 32960 <br />In accordance with allterms, conditions, specifications, and requirements, the Bidder offers the <br />following: <br />Bid Item41see Below) <br />Quantity <br />Unit Price <br />Total Price <br />1. Construct approximately 700 -LF of maintenance <br />berm as shown on the plans and attached scope <br />of work. The spoil material (fill) excavated in 2009 <br />during construction on the spoonbill marsh facility was <br />moved, graded and stored for future use on the <br />adjoining parcel. Fill material lies in a surface layer <br />roughly 5 feet thick and is a mixture of shell rock, sand <br />and limestone rock of various sizes can be used for the <br />construction of the berm. <br />LS <br />$44,888.00 <br />$ 44,888.00 <br />Total Bid Price <br />$44,888.00 <br />Total Bid Price in Words <br />Forty Four Thousand Eight Hundred Eighty Eight Dollars and Nc <br />Alternate Bid for item No. 1- Additional 300 -LF of <br />berm installation east of item no.1 as depicted on the <br />plans. This will require an additional of 437 cubic yards <br />of fill material and 66 cubic yards of coquina. <br />LS <br />$20,199.00 <br />$20,199.00 <br />Total Revised Bid Price with Alternate Bid Items <br />$65,087.00 <br />Total Bid Price with Alternate Bid Items in Words <br />Sixty Five Thousand Eighty: Seven Dollars and No Cents <br />List the name, address, and contact information of the Directional Boring Contractor to be used on this <br />project: <br />Name N/A <br />Address <br />Phone <br />E-mail <br />Fax <br />169 <br />Cents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.