My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/07/2020
CBCC
>
Meetings
>
2020's
>
2020
>
04/07/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:37:24 PM
Creation date
6/1/2020 12:14:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/07/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: <br />To: <br />From: <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />March 31, 2020 <br />Jason E. Brown, County Administrator <br />Vincent Burke, PE, Director of Utility Services <br />Prepared By: John M. Boyer, PE, Utilities Engineer <br />Subject: Utility Work by Highway Contractor Master Agreement with FDOT <br />Utility Relocations —1-95 & Oslo Road Interchange <br />FDOT Project #413048 <br />Background: <br />Florida Department of Transportation (FDOT) is planning to construct a new interchange along 1-95 at Oslo <br />Road. The County's existing water, sewer and reuse mains in the project area will be relocated as part of <br />the roadway construction. The FDOT and Indian River County Department of Utility Services (IRCDUS) will <br />thus enter into a master agreement for the construction of utilities by the FDOT contractor. The FDOT will <br />provide a utility relocation cost estimate at a later date; it is anticipated that some of the utility relocation <br />cost will be paid by FDOT. Per Section 3c of the Agreement IRCDUS may accept or reject the FDOT cost <br />proposal. <br />The County Attorney has determined the agreement should be signed by the Chairman of the Board of <br />County Commissioners. <br />Funding: <br />No funding is required at this time. <br />Recommendation: <br />Staff recommends the Chairman of the Board of County Commissioners executes the Florida Department <br />of Transportation (FDOT) — Utility Work by Highway Contractor Master Agreement for FDOT Project <br />#413048 —1-95 and Oslo Road Interchange. <br />Attachment(s): <br />1. FDOT - Utility Work by Highway Contractor Master Agreement. <br />171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.