Laserfiche WebLink
ORDER NO. PSC -2020 -0085 -TRF -EI <br />DOCKET NO. 20190223 -EI <br />PAGE 10 <br />FLORIDA POWER & LIGHT COMPANY <br />SevenlhhEighth Revised Sheet No. 8.737 <br />Cancels Si et#hSeventh Revised Sheet No. 8.737 <br />(Continued from Sheet,No. 8.736) <br />Maintenance per Fixture (FPL Owned Fixture and Pole) <br />Maintenance per Fixture for FPL Fixtures on Customer Pole <br />LED Conversion Recovery <br />Notes: <br />The non -fuel energy charge. is 3.0410 per kWh. <br />Bills rendered based on "Total" charge, Unbundling of charges is not permitted. <br />Charges for other FPL -owned facilities: <br />Wood:pole used only for the street lighting- <br />system <br />Standard Concrete pole used only for the street lighting system <br />Round Fiberglass pole used only for,the street lighting system <br />Decorative Tall Fiberglass pole used only for the street lighting system <br />Decorative Concrete pole used only for the street lighting system <br />Underground conductors <br />$44-21.29 <br />$-44-7-1.03 <br />$4,0,31 87 <br />$5:20 <br />$7.11 <br />$8.42 <br />$17.76 <br />$14.42 <br />4.024 0 per foot <br />SPECIAL PROVISIONS: <br />Where the Coinpany.provides poles other than those listed above, the monthly charges, as applicable shallbe computed as follows: <br />Facilities Charge: 1.63% of the Company's average installed cost of the pole. <br />BILLING. <br />During the initial installation period: <br />Facilities in service for 15 days or less will not be billed; <br />Facilities in service for 16 days or more will be billed:for a full month <br />WILLFUL DAMAGE: <br />Upon the.second'occurrence of willful damage to any FPL -owned facilities, the Customer willbe responsible for the cost incurred for repair <br />or replacement. If the lighting fixture is damaged, based on prior written instructions from the Customer, FPL will: <br />a) If a commerciallyavailable and FPL approved device exists, install a protective shield. The Customer shall pay $280.00 for the <br />shield plus all associated costs. However, if the Customer chooses to have the shield installed before.the second occurrence, the <br />Customer shall only pay the cost of the shield; or <br />b) Replace with.a like unshielded fixture. For this, and each subsequent occurrence, the Customer shall pay the estimated costs of <br />the replacement fixture; or <br />c) Terminate service to the fixture. In this case, the lighting facilities will be removed from the field and from billing; the customer <br />will pay the` lightingfacilities charges for the remaining period of the currently active term of service plus the cost to remove the <br />facilities. <br />Option selection shall be made by the Customer in writing and apply to all fixtures which FPL has installed on the Customer's behalf on the <br />same account. Selection changes may be made by the Customer at any time and will become effective ninety (90) days after written notice is <br />received. <br />(Continued on Sheet No. 8.738) <br />Issued by: Tiffany Cohen, Director, Rates and Tariffs <br />Effective: <br />- ip <br />