My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-105A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-105A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:52:34 AM
Creation date
6/10/2020 9:36:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/19/2020
Control Number
2020-105A
Agenda Item Number
15.B.3.
Entity Name
CDM Smith, Inc.
Subject
Approve Work Order No. 2 Expansion Design, Permitting and Bidding Services
Area
Segment 3 Cells 1 and 2 Landfill Gas System
Bid Number
Qualification #2017048
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on recent discussions with SWDD staff and our familiarity with the landfill site and preliminary <br />review of the existing permit drawings, the proposed Scope of Services includes the following tasks: <br />TASK 1.0 - PROJECT QUALITY MANAGEMENT <br />Activities performed under this task consist of those generally administrative functions required to <br />maintain the project on schedule, within budget, and that the quality of the work products defined <br />within this scope is consistent with CONSULTANT's standards. <br />Task 1.0 includes the specific activities identified below: <br />Subtask 1.1- Project Update Meetings <br />CONSULTANT's project manager will prepare for status meetings throughout the life of the project. <br />It is estimated that meetings will be held on the average of once a month for four months (4 project <br />update meetings total). <br />Subtask 1.2 - Quality Technical Reviews <br />CONSULTANT maintains a quality management system (QMS) on all of its projects. One formal <br />quality technical review committee (TRC) meeting has been budgeted for and will be conducted at <br />the 60 percent completion stage of the project. SWDD's representatives will be invited to attend and <br />participate in the TRC meeting. <br />Deliverables: <br />• A Complete set of draft Contract Documents for review (electronic PDFs of the drawings and <br />technical specifications) at 60 percent and the 100 percent design level. <br />Subtask 1.3 - Final Design Review <br />CONSULTANT will prepare and submit a complete set of Contract Documents (drawings and <br />technical specifications as electronic PDFs) to SWDD for review at the 100 percent (final) <br />completion stage. CONSULTANT will also perform a final comprehensive design review at the <br />100 percent milestone to perform final quality checks and to confirm that the proposed design <br />meets the requirements of SWDD. CONSULTANT will prepare for and attend one meeting with <br />SWDD staff to review comments on the 100 percent design drawings and technical specifications. <br />CONSULTANT will incorporate SWDD's written comments, prepare the final Contract Documents <br />(Issued for Bid), and submit two hard copies and electronic PDFs of the design drawings and <br />technical specifications to the SWDD. <br />Deliverables: <br />■ Final Contract Documents (Issued for Bid) —two signed and sealed hard copies and electronic <br />PDFs. <br />TASK 2.0 - MEETINGS AND DATA COLLECTION <br />This task focuses on obtaining the necessary preliminary information to prepare detailed engineering <br />plans and construction specifications. <br />Task 2.0 includes the specific activities identified below: <br />C. A-2 ll2756Exhibit A.dmx <br />
The URL can be used to link to this page
Your browser does not support the video tag.