My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-088
CBCC
>
Resolutions
>
1990'S
>
1993
>
1993-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:43:36 AM
Creation date
6/15/2020 11:43:25 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1993-88
Approved Date
05/11/1993
Resolution Type
Amending development order for Grand Harbor DRI
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 53-88 <br />S1. The developer shall not receive building permits for any <br />Harbor after December 31, <br />portion of development of Grand <br />2000, until a traffic analysis is conducted by the developer <br />and submitted to Indian River County, Treasure Coast Regional <br />Planning Council, the Department of Community Affairs, and the <br />Florida Department of Transportation. The methodology to be <br />used in the traffic analysis shall be determined in agreement <br />between Indian River County, Treasure Coast Regional Planning <br />Council, the Department of Community Affairs, and the Florida <br />Department of Transportation. The traffic analysis will <br />address the following: <br />a. projected timing of the remaining building permits and <br />certificates of occupancy for the development of Grand <br />Harbor; and <br />b. identification of roadway and intersection improvements <br />necessary to maintain Level of Service C during average <br />conditions and Level of Service D during peak season <br />conditions (peak hour, peak direction) for the subject <br />transportation including project impacts and growth in <br />background traffic. <br />C. The Developer shall not receive building permits and/or <br />Certificates of Occupancy for the development of any <br />portion of Grand Harbor after December 31, 2000, until <br />the Transportation Section of the development order is <br />amended to incorporate new and/or revised conditions that <br />reflect the results of the traffic analysis identified <br />above. <br />52. The developer shall submit an annual traffic monitoring report <br />in accordance with General Condition 3(i)-11 of the <br />development order. In addition, the developer shall evaluate <br />the need for traffic signals at the following locations in <br />accordance with Conditions 48 and 50: <br />a. U.S. 1 and Harbor Drive <br />b. Indian River Boulevard and Harbor Drive <br />C. Indian River Boulevard and 45th Street <br />The annual traffic monitoring report shall be conducted during <br />the first quarter of each reporting year to provide traffic <br />information on peak season conditions. <br />53. Access to Grand Harbor shall be from 53rd Street, Grand Harbor <br />Boulevard, Indian River Boulevard, and the one U.S. 1 access <br />at Grand Harbor Boulevard. All future access locations and <br />designs shall be approved by Indian River County. <br />The remaining development order conditions #63 through #65 are <br />renumbered to be conditions #54 through #56 with no change to their <br />language. <br />The foregoing resolution was offered by Commissioner <br />-Exj4 rt and the motion was seconded by Commissioner <br />Aflame , and, upon being put to vote, the vote was as <br />follows: <br />Chairman Richard N. Bird Aye <br />Vice Chairman John W. Tippin Ave - <br />Commissioner Fran Adams Aye <br />Commissioner Carolyn Eggert Ave <br />Commissioner Kenneth Macht Am <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.