My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/21/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
01/21/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2023 9:22:44 AM
Creation date
6/17/2020 1:29:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/21/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compatibility with Surrounding Areas: <br />Compatibility is an important consideration in any PD rezoning request. In this case, it is important to <br />consider compatibility of the proposed project with properties in the immediate area, and those within the <br />general area. <br />Immediate Area: <br />The properties along the eastern third of the north project boundary are developed with conventional <br />single-family homes, the middle third are ±5 acre parcels developed with single-family homes and <br />accessory buildings, and the western third consists of a±10 acre single-family parcel and a±20 acre vacant <br />parcel. The project site is separated from the properties to the north by the North Relief Canal that lies <br />within a ±250' wide canal ROW. To ensure compatibility, the PD regulations require a 25' wide Type "B" <br />buffer along the north project boundary for all properties inside the Urban Service Area, and the proposed <br />conceptual PD plan and conceptual landscape plan provide the required 25' Type "B" buffer (see <br />attachments 5 and 6). The County LDRs require a 50' Type "A" buffer along north project boundary for all <br />properties outside the Urban Service Area, and the proposed conceptual PD plan and conceptual landscape <br />plan provide the required 50' Type "A" buffer (see attachments 5 and 6). <br />The properties east of the project site are developed with single-family homes as part of the Waterway <br />Village PD. The project site is separated from the properties to the east by 58th Avenue, and the PD <br />regulations require a 25' wide Type "B" buffer along the east project boundary. The proposed conceptual <br />PD plan and conceptual landscape plan provide the required 25' Type "B" buffer (see attachments 5 and 6). <br />Most of the properties south of the project site are vacant and are part of the Providence Pointe PDTND <br />project. The project site is separated from the properties to the south by 53`d Street, and the PD regulations <br />require a 25' wide Type "B" buffer along the south project boundary. The proposed conceptual PD plan <br />and conceptual landscape plan provide the required 25' Type "B" buffer (see attachments 5 and 6). <br />The property immediately west of the project site is a ±18 acre vacant parcel that is outside of the Urban <br />Service Area and is zoned A-1. The County LDRs require a 50' Type "A" buffer along west project <br />boundary, and the proposed conceptual PD plan and conceptual landscape plan provide the required 50' <br />Type "A" buffer (see attachments 5 and 6). <br />Based on input provided during the PZC public hearing, staff is providing additional compatibility analysis <br />for the 100 -room hotel portion of the project with the immediate surrounding area. Generally, hotel or <br />lodging uses are common within a Traditional Neighborhood Design (TND) project, and have been <br />included in other County -approved TND projects such as Pointe West and Providence Pointe. However, <br />neither hotels have been constructed within those projects. <br />For the proposed project, the hotel site is located internal to the overall project layout, is set back <br />approximately 450' from 58th Avenue, and is set back approximately 650' from the nearest existing or <br />proposed external residential unit. Also, the hotel is subject to the typical 35' building height limitation <br />provided for all commercial and multi -family portions of the project. Lastly, the hotel building and site is <br />required to be fully compliant with all of the "Other" Corridor special development regulations. Therefore, <br />it is staff's opinion that the hotel portion of the project is compatible with the proposed TND project, and <br />the immediate surrounding area. <br />108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.