Laserfiche WebLink
Derived from inside USA: 199 units or 92% <br />Required (minimum): 130 units or 60% <br />Note: The maximum density calculation is based on a weighted average of the L-1 designated <br />portion of the project site (66.58 acres) and the AG -1 designated portion (18.04 acres). Per the <br />TND criteria, at least 60% of the project density must be derived from inside the USA and a <br />residential density of 1 unit/acre was utilized for the AG -1 portion of the site located outside the <br />USA. <br />7. Open Space: <br />Required: 44.0% <br />Proposed: 49.5% <br />Note: The minimum required open space calculation is based on a weighted average of the L-1 <br />designated portion of the project site and the AG -1 designated portion. <br />8. Recreation Area: <br />Required: 5.93 acres <br />Proposed: 9.25 acres <br />Note: Recreation areas include a clubhouse with a pool, walking trails around the stormwater <br />system, several common area/recreation tracts, and all of the littoral zone areas. <br />9. Phasing: The developer provided a conceptual phasing plan that generally defines two phases. <br />Phase 1 will include the project's primary driveway connection to 53rd Street, the primary east to <br />west internal subdivision road, and all of the project's stormwater pond. Phase 2 is broken into <br />multiple sub -phases that can "connect" to the primary infrastructure provided with Phase 1, and can <br />be developed based on market demand for the various project components (i.e. single-family <br />residential, multi -family residential, or limited commercial). <br />10. Utilities: The project will be served by public water and sewer service provided by County Utility <br />Services. The County Department of Utility Services and the Department of Health have approved <br />these utility provisions. <br />11. Parking: The developer has committed to providing the number of parking spaces required by the <br />County's parking regulations for all proposed uses. Under those regulations, the developer may, at a <br />future date, prepare a shared parking study for the commercial area to justify lower rates. Such <br />rates, if requested, will require Planning and Zoning Commission approval. Any such shared <br />parking study will need to comply with LDR parking regulations in Section 954.08(2). Staff <br />anticipates that there will be shared parking among the various commercial area uses and will <br />encourage use of the parking study option during review of preliminary PD plans. <br />12. Stormwater Management: The project's conceptual stormwater design proposes an <br />interconnected stormwater system and one large stormwater management tract to manage runoff <br />generated by the project as well as offsite runoff generated by the proposed paving of 53rd Street. <br />Through the final PD plat process, the stormwater tract will be dedicated to the property owners' <br />association, and stormwater easements will be dedicated to the County to connect the 53rd Street <br />drainage to the stormwater management tract. Public Works has accepted the project engineer's <br />certification of the project's conceptual stormwater design. The final design will be reviewed and <br />approved by Public Works via the land development permit (LDP) review process. <br />110 <br />