INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />CONSEN <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka, P.E., Public Works Director <br />THROUGH: James W. Ennis, P.E., PMP, Asst. Public Works Director <br />FROM: Molly Klinepeter, M.S., Lagoon Plan Environmental Specialist <br />SUBJECT: Work Order No. 13 - Morgan & Eklund, Inc. <br />2020 Beach Profile Monitoring Surveys (WINTER) <br />DATE: January 7, 2020 <br />DESCRIPTION AND CONDITIONS <br />On October 4, 2016, the Board approved a contract with Morgan and Eklund, Inc. (M&E) for <br />Professional Land Surveying and Mapping Services for a two-year term. The Board amended the <br />Contract on October 18, 2016. The contract was renewed for an additional two-year term on <br />October 4, 2018. M&E is the selected County Consultant for professional onshore/offshore <br />hydrographic surveying services. <br />The County's Beach Preservation Plan recommends semi-annual beach profile surveys in order <br />to monitor the seasonal, summer and winter, fluctuations of the beach. Proposed Work Order <br />No. 13 provides winter -time countywide hydrographic surveying (beach profile) services for the <br />Sector 3 and Sector 7 Beach Restoration Projects and additional surveying to begin a 2020 <br />countywide (22.4 miles) monitoring effort. Additionally, the winter 2020 Sector 7 beach profile <br />survey will provide necessary data for the design of the upcoming Sector 7 beach re -nourishment <br />project. All onshore and offshore beach profile surveys are conducted along the Florida <br />Department of Environmental Protection (FDEP) Range Monuments at approximately 1,000 foot <br />intervals (alongshore) and extend from the vegetated dune seaward to a location approximately <br />-40 feet offshore (cross -shore). Only Sector 7 has additional quarter and half monument intervals <br />to follow the physical monitoring requirements of the previous Sector 7 beach nourishment <br />project. For project tracking purposes, Work Order No. 13 is divided into three (3) separate tasks. <br />Task 1: Winter 2020 Sector 3 Beach and Dune Restoration Project Monitoring Survey (R-15 to R- <br />60, 46 Onshore/Offshore Profile Lines) <br />In 2012, the County completed construction of the Sector 3 Beach Restoration Project, which was <br />subsequently repaired in 2015. The County has completed all Permit required post construction <br />monitoring for the Sector 3 Project. However, hydrographic surveys of the project area must <br />continue semi-annually to determine the long-term performance of the project and if <br />infrastructure may be vulnerable to storm damage during years in between recommended beach <br />projects identified in the Beach Preservation Plan. Task 1 includes all surveying (7.5 miles) <br />74 <br />