Laserfiche WebLink
EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately six (6) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Initial Submittal (40% Design Drawings) 2 months following NTP <br />Interim Submittal (80% Design Drawings) 4 months following NTP <br />Final Submittal (100% Design Drawings) 6 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />42 <br />