Laserfiche WebLink
Property to the east of Subject Property 1 is owned by applicant and contains a portion of the <br />CEMEX, cement facility. No incompatibilities are anticipated between this property and the <br />property to the east as Subject Property 1 is intended to be incorporated as part of the CEMEX <br />operation. Subject Properties 2 and 3 are also owned by applicant. <br />With respect to the 53rd Street Road frontage, development of the 3 subject properties will be <br />required to comply with the County's "Other Corridor Regulations". Those regulations are found <br />in Section 911.22 of the County's LDRs. With respect to design requirements, the special corridor <br />regulations will provide for such things as shielding of any outdoor lighting fixtures, additional <br />vegetation plantings, and various aesthetic improvements. <br />Land to the north of the rezoning request is a portion of the Hawk's Nest Golf Course. That Golf <br />Course is separated from Subject Properties 1- 3 by the North Relief Canal, which is located within <br />a 250 -foot right-of-way. This canal right-of-way also separates the proposed CG property (nearest <br />property included inrezoning request) from the Indian River County Utilities Department Rapid <br />Infiltration Basin (located to the northwest), which is a permitted wastewater discharge site, and <br />is used when deemed necessary by Utilities. <br />Given the existing C/I Future Land Use designation of each of the subject properties and properties <br />to the south, the existence of 53rd Street to the south, the existence of Lateral H canal to the west, <br />the existence of the North Relief Canal to the north, and the conservation area to the west and the <br />related separation distances; staff feels the proposed IG, CH, and CG zoning districts for the <br />subject properties are appropriate. <br />Meeting Between the Applicant and Hawk's Nest Golf Course <br />On January 9, 2020, the applicant and their representative (Bruce Barkett) met with <br />representatives from Hawk's Nest Golf Course which is located north of the subject properties. <br />E-mails provided by Mr. Barkett dated January 10, 2020 and January 27, 2020 (Attachments 9 <br />and 10) indicate that the applicant and representatives from Hawk's Nest Golf Course exchanged <br />information and discussed concerns about noise, visible structures and what, if any expansion <br />plans are currently planned for the existing CEMEX facility. <br />Also at that meeting, there was a discussion about the approved Environmental Resource Permit <br />(ERP) from the Florida Department of Environmental Protection:(FDEP) held by CEMEX. That <br />permit includes authorization to fill in the southern half of the existing sand mine lake and <br />maintain the northern half of the lake and vegetation (closest to Hawk's Nest Golf Course). While <br />not specifically discussed in the emails, any future expansion of the existing useand any proposed <br />new use for the subject properties will need to meet County site design requirements, including <br />buffering between the Hawk's Nest Golf Course and subject properties. While site design factors <br />are important with development, site design issues are not part of a rezoning request, and should <br />not be part of a rezoning action. <br />88 <br />