Laserfiche WebLink
UTILITIES / SITE CONSTRUCTION <br />April 23, 2020 <br />Mr. Himanshu H. Mehta, PE <br />Managing Director <br />Indian River County — Solid Waste Disposal District <br />1325 74th Avenue SW <br />Vero Beach, Florida 32968 <br />Re: Improvements to the Organics Parcel — West Lot improvements <br />West Lot - Scope of Work: <br />Intent of work is to "square off' the improved organics collection area, perform maintenance on <br />adjacent stormwater ditches and improve storm water conveyance across the southwestern <br />access road. <br />Services shall include scraping the work area, cut and balance of the work area, proof rolling, <br />importing, spreading and compacting clean, fill dirt (7,800 cyds) and setting final grades <br />consistent with the intent of a consistent cross slope per the previous work. Ditch maintenance <br />shall include removal of vegetation, regrading banks and installing Bahia sod to stabilize bank <br />slopes. A storm structure and piping shall be installed at the road crossing located at the <br />southwestern corner of the site to collect and convey storm water that is currently sheet flowing <br />across the unimproved access road causing maintenance issues. <br />Description Qty Unit Costs <br />Ditch Maintenance 1 LS $ 9,400.00 <br />Bahia sod for bank stabilization 9,500 SF $ 6,915.00 <br />Pipe / Structure at road crossing 1 LS $ 9,330.00 <br />Scrape / Cut and Balance Site 7,800 CY $ 5,120.00 <br />Proof Rolling 1 LS $ 3,600.00 <br />Import Fill / Place and Compact 1 LS $ 110,214.00 <br />Final Grades 1 LS $ 8,848.00 <br />Bonding Fee <br />Subtotal $ 153,427.00 <br />1 LS $ 4,603.00 <br />Total $ 158,030.00 <br />SITECRAFTERS OF FLORIDA, INC. <br />INTEGRITY • QUALITY • COMMITMENT <br />2207 W. North 'A' Street Tampa, Florida 33606-1583 813.258.4696 Fax: 813.254.3689 <br />www.sitecraftersfl.com <br />An Equal Opportunity Employer <br />95 <br />