My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/12/2020
CBCC
>
Meetings
>
2020's
>
2020
>
05/12/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:43:46 PM
Creation date
7/7/2020 1:42:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/12/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />CONSENT <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka, P.E., Public Works Director <br />FROM: Eric Charest, Natural Resources Manager <br />SUBJECT: Sector 3 Beach and Dune Nourishment Project (IRC1925) <br />APTIM, Work Order No. 2018006-7, Pre -Construction Services <br />DATE: April 29, 2020 <br />BACKGROUND AND DESCRIPTION <br />On January 9, 2018, the Board of County Commissioners (BCC) approved a contract with Aptim <br />Environmental & Infrastructure, Inc. (APTIM) for professional coastal engineering and biological <br />support services related to the management and nourishment of the Sector 3 (Wabasso Beach) <br />Beach and Dune Nourishment Project. The Sector 3 project area is a critically eroded 6.6 -mile <br />section of shoreline that extends from the Seaview Subdivision south to the Turtle Trail beach <br />park. The Sector 3 project area sustained damage from Hurricane Matthew (2016), Irma (2017), <br />and Dorian (2019) creating the need for repair. <br />The proposed Work Order No. 2018006-7 includes six (6) separate tasks pertaining to the pre - <br />construction services of the Sector 3 Beach and Dune Nourishment Project. Task 1 covers <br />continued coordination with permitting agencies for $3,711.00. Task 2 covers bid development, <br />solicitation, and awarding for $12,928.00. Task 3 covers pre -construction submittals for <br />$4,851.00. Task 4 covers pre -construction meetings for $8,097.00. Task 5 covers pre - <br />construction design updates for $7,516.00. Task 6 covers coordination with the Sector 7 beach <br />and dune restoration project for $4,530.00. Work Order No. 2018006-7 is for a lump sum amount <br />of $41,633.00. <br />FUNDING <br />Local funding of Beach Restoration includes a portion of Local Option Tourist Tax Revenue. <br />Funding for the pre -construction monitoring in the amount of $41,633.00 is budgeted and <br />available for the Sector 3 Beach Nourishment Project in the Beach Restoration Fund/Sector 3 <br />Beach Renourishment/Hurricane Matthew, Account No. 12814472-066514-17001. <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.