My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/28/1995
CBCC
>
Meetings
>
1990's
>
1995
>
3/28/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:21:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Bird couldn't imagine how unattractive these <br />breakwaters would be sticking out of the water at low tide and <br />exposing all the barnacles and algae. <br />Mr. Donaldson explained that if we want to stop the erosion, <br />we need to make the reefs taller. <br />Jeremy Kraft, director of the Division of Environmental <br />Resource Permitting, of the Department of Environmental Protection, <br />advised that his motive in coming down here today is to see if we <br />couldn't come to some resolution on this and move forward. <br />Certainly, sitting here and debating the issues doesn't solve <br />erosion problems. Whether or not the PEP reef will solve the <br />erosion problem is a matter of debate, but there is one sure way to <br />find out. He did not expect the agency to change requirements for <br />the reef, but he preferred to work together rather than have <br />antagonistic efforts. Mr. Kraft stated he would like to see us <br />move toward issuance of a permit so this reef can be constructed if <br />that is the County's desire. <br />Mr. Kraft referred to the following letter written by Paden E. <br />Woodruff, senior engineer, dated 3/24/95: <br />-- — --- - <br />B.ce March 24, 1995 t,5Z`Z7t�g; <br />ug. Serv. <br />e Mgt. egAR <br />Dr.-- Be�! . hell, Vice President <br />American Coastal Engineering Inc. t �; <br />201 North Flagler Drive <br />West Palm Beach, Florida 33401 V <br />�rj <br />Don G. Donaldson, P.E. Coastal Engine <br />Board of County Commissioners <br />1840 25th Street eo <br />Vero Beach, Florida 32960 °��10 <br />Dear Ms. Mitchell and Mr. Donaldson: <br />SUBJECT: DBS -9A0342, PEP Reef, Vero Bea�� n' River County <br />This is in response to your letter with enclosures dated February <br />23, 1995, received by this office February 24, 1995. Department <br />staff has reviewed all of the information with your letter and <br />provides the following sthtus of the informational requirements <br />in order to complete the application. The original numbering <br />will be used. <br />1. and l.a. Comparison of the 1972 and 1993 profiles has not <br />been accomplished as requested in the May 26, 1994, letter. The <br />table requested in the letter of January 4, 1995, has also not <br />been provided. As indicated in this correspondence, the Bureau <br />can review the data to determine an appropriate erosion rate. It <br />will be necessary to obtain the 1993 data in digitized form, <br />(i.e., on floppy disk). The data should be formatted to include <br />distance from the monument and elevation relative to NGVD. The <br />data should be -'accompanied by control information, including <br />MARCH 28, 1995 <br />L <br />23 <br />BOOK 94 mu 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.