My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/28/1995
CBCC
>
Meetings
>
1990's
>
1995
>
3/28/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:21:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gary Glenewinkel, senior vice president of Centex Rooney <br />Construction Co., Inc., pointed out that their main duty is to <br />monitor the project, maintain the budget, and see that the project <br />does not get out of control. He emphasized that the change orders <br />amount to less than 5% of the construction costs, and from a cost <br />standpoint the project has been very successful. <br />Mr. Glenewinkel then reviewed change orders 17, 18, and 19 and <br />asked if there were any questions: <br />DATE: MARCH 14, 1995 <br />TO: HONORABLE BOARD OF COUNTY COMMISSIONERS <br />THRU: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: H.T. "SONNY" DEAN, DIRECTOR <br />DEPARTMENT OF GENERAL SERVICES <br />SUBJECT: INDIAN RIVER COUNTY COURTHOUSE PROJECT <br />CHANGE ORDER NUMBER 17 <br />BACKGROUND: <br />This proposed change order to the contract between James A. <br />Cummings, Inc. and Indian River County is necessitated due to the <br />following construction changes on the subject project: <br />Item #1 Redesigned concrete beams and moved $4,683.00 <br />fire protection lines at Interstitial <br />level. (ARCHITECT) <br />Item #2 Increase size of fan motors in two 2,663.00 <br />Air Handling Units. (IAQ CONSULTANT) <br />Item #3 Lowering of ceiling allowed deduct for (140.00) <br />paint. (ARCHITECT) <br />Item #4 Add structural dowels in covered walk- 474.00 <br />way. (ARCHITECT) <br />Item #5 Add low wall stiffeners in Courtrooms. 5,817.00 <br />(ARCHITECT) <br />Item #6 Add return air humidity sensors. 7,643.00 <br />(PREVIOUSLY APPROVED BY BOARD) <br />Item #7 Additional fire sprinkler heads in 3,329.00 <br />some mechanical rooms. (ARCHITECT) <br />Item #8 Add steel closure plate on windows 774.00 <br />in interstitial for protection from <br />inmates. (ARCHITECT) <br />Item #9 Modify tree grates for oversize trees. 1,143.00 <br />(ARCHITECT) <br />Item #10 Grout certain open joints in parking 4,242.00 <br />garage. (ARCHITECT) <br />Item #11 Trim pre -fitted doors in restrooms 921.00 <br />to clear tile. (ARCHITECT) <br />41 Boa 94 PAu % <br />MARCH 28, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.