My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/18/2020 (4)
CBCC
>
Meetings
>
2020's
>
2020
>
02/18/2020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:25 PM
Creation date
7/10/2020 10:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/18/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/30/2020 <br />ESTIMATED TIME FRAME FOR DESIGN, PERMITTING, AND <br />RESTORATION OF BUILDING <br />• 30 DAYS: PERMITTING FOR INSTALLED WINDOWS AN DOORS (OR <br />INCORPORATE WITHIN OVERALL RENOVATION PERMIT) <br />• 90 DAYS: OWNER OBTAINS DESIGN PROFESSIONAL AND CONTRACTOR, <br />PRODUCES PLANS, SUBMITS -COMPLETE APPLICATION FOR RENOVATION PERMIT <br />• PERMIT REVIEW PERIOD: 10-30 DAYS, DEPENDING ON COMPLETENESS OF <br />APPLICATION <br />• CONSTRUCTION/RENOVATION COMPLETION: WITHIN 6 MONTHS OF <br />COMMENCEMENT <br />• TOTAL TIME FRAME: APPROXIMATELY ONE YEAR'. <br />4 <br />os -t} <br />
The URL can be used to link to this page
Your browser does not support the video tag.