My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/18/2020 (4)
CBCC
>
Meetings
>
2020's
>
2020
>
02/18/2020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:25 PM
Creation date
7/10/2020 10:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/18/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
designed plans for the initial segment on or before December 2020. Due to the accelerated schedule and <br />the fact that Snubbs was the drainage engineer for the roadway design and had qualifications to perform <br />utility design work, IRCDUS requested a scope of work from Snubbs. <br />The proposal submitted by Snubbs is broken into segments. The design is broken into two segments, and <br />the construction is broken into four segments. Although Consor and Metric are the roadway design <br />consultants for FDOT, Snubbs is providing drainage design services to both consultants. The below outlines <br />the breakdown: <br />= Construction from CR 512 to 87th Place - FM# 405606.7 <br />= Construction from 87th Place to west of 82nd AVE. - FM# 405606.8 <br />= Design (Consor) from CR 512 to west of 82nd AVE - FM# 405606.4 <br />IIMME = Construction from west of 82nd AVE. to Powerline Road - FM# 405606.5 <br />® = Construction from Powerline Road to 58th AVE. - FM# 405606.6 <br />11 <br />lei = Design (Metric) from west of 82nd AVE to 58th AVE - FM# 405606.3 <br />The utility relocation design cost and the estimated relocation construction cost for each segment are <br />outlined in the below table: <br />Table 1 <br />120 <br />16" WM, 12" FM & 12" Reuse WM ($000K) <br />Construction <br />Design <br />405606.7 <br />3,840 <br />272 <br />405606.8 <br />4,320 <br />300 <br />405606.4 (Subtotal): 8,160 572 <br />405606.5 <br />7,370 <br />392 <br />405606.6 <br />6,290 <br />363 <br />405606.3 (Subtotal): 13,660 755 <br />Total $21,820 $1,327 <br />120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.