Laserfiche WebLink
ATTACHMENT D <br />Scope of Work <br />The scope of the work for this Task Work Order (TWO) includes: <br />Installation of approximately 8,201 LF of 16" ductile iron pipe (DIP) water main and fittings along CR 510. <br />Installation of approximately 8,170 LF of 12" C-900 PVC force main and fittings along CR 510. <br />Installation of approximately 8,170 LF of 12" ductile iron pipe (DIP) Reuse water main and fittings along CR 510. <br />Installation of new fire hydrants along CR 510. <br />Removal or Grout Fill/Abandon of the existing 16" water main along CR 510. <br />A A A A A A <br />Services to be provided (for each of four FPIDs) <br />The Scope of Work for this TWO includes the followin <br />Coordination with: <br />a. Florida Dept. of Transportation (FDOT) <br />b. Indian River County Utilities <br />Florida Department of Environmental Protection <br />U <br />d. Indian River Farms Water Control District <br />16" water mains and associated connections and appurtenances along CR -510. <br />12" force main and associated connections and appurtenances along CR 510. <br />12" Reuse water mains and associated connections and appurtenances along CR 510. <br />D <br />N <br />