Laserfiche WebLink
SUBACTIVITY: 4 (Utility Coordination <br />ATTACHMENT D <br />REMARKS <br />Perform Initial contact to obtain all existing as -built information from the <br />existing UA/O on the project <br />Follow up with UA/O for additional information, mark ups and <br />transmittal of plans to ensure no conflict with their existing utilities. <br />Assume 5 UAOs as 2 hours per UAO <br />Assumes this was previously done for another FPID, thus only requires <br />revisions thereto <br />Prepare agenda, attend utility meeting, prepare minutes and follow up <br />(includes travel) <br />CADD <br />HOURS <br />TOTAL <br />HOURS <br />CO <br />o <br />a- <br />CO <br />46 <br />46 <br />NO. OF <br />SHEETS <br />SUBACTIVITY SUBTOTAL <br />SUBACTIVITY TOTAL <br />HOURS/ <br />UNIT <br />00 <br />N <br />a <br />NO. OF <br />UNITS <br />LC) <br />1-- <br />N <br />BASIS <br />OF <br />ESTIMATE <br />LS <br />CO <br />J <br />LS <br />EA <br />F <br />Initial Contact with Utility Agency Owner (UAO) <br />Coordination with UAO <br />Assisting with execution of constrution agreements <br />Attend Utility Meetings <br />a- <br />N <br />CO <br />R <br />