My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/18/2020 (4)
CBCC
>
Meetings
>
2020's
>
2020
>
02/18/2020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:25 PM
Creation date
7/10/2020 10:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/18/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />Scope of Work <br />The scope of the work for this Task Work Order (TWO) includes: <br />Installation of approximately 5,275 LF of 16" ductile iron pipe (DIP) water main and fittings along CR 510. <br />A <br />> Installation of approximately 5,340 LF of 12" C-900 PVC force main and fittings along CR 510. <br />O <br />LO <br />U <br />0) <br />c <br />0 <br />0) <br />0) <br />cv <br />E <br />'di <br />4 <br />ca <br />(3) <br />a) <br />a <br />0 <br />a) <br />a <br />.0 <br />0 <br />w <br />0 <br />a <br />N Ln <br />0 0 <br />U 0) <br />C <br />0 <br />O N <br />CO <br />>, cB <br />c <br />• � <br />X <br />O <br />CD - <br />c). n a) <br />RI C <br />O 0 <br />C C <br />O 0 <br />+r := <br />co c5 <br />R) cv <br />4- rr <br />N v1 <br />C C <br />A A A A <br />16" water main along CR 510. <br />Removal or Grout Fill/Abandon of the existing <br />Removal or Grout Fill/Abandon of the existing <br />Services to be provided (for each of four FPIDs) <br />The Scope of Work for this TWO includes the followin <br />Coordination with: <br />Florida Dept. of Transportation (FDOT) <br />c4 <br />b. Indian River County. Utilities <br />Florida Department of Environmental Protection <br />Sebastian River Improvement District <br />U "d <br />Development of a preliminary alignment along CR 510 and proposed tie-in locations for existing laterals <br />Detailed design (combination plan and profile) of <br />N <br />16" water mains and associated connections and appurtenances along CR 510. <br />12" force main and associated connections and appurtenances along CR 510. <br />12" Reuse water mains and associated connections and appurtenances along CR 510. <br />c0 U <br />
The URL can be used to link to this page
Your browser does not support the video tag.