Laserfiche WebLink
ATTACHMENT B <br />Scope of Work <br />The scope of the work for this Task Work Order (TWO) includes: <br />16" ductile iron pipe (DIP) water main and fittings along CR 510. <br />Installation of approximately 6,130 LF of <br />Installation of approximately 5,840 LF of 12"C-900 PVC force main and fittings along CR 510. <br />(0 <br />c <br />E <br />L <br />(0 <br />a0 <br />z <br />m <br />d <br />0 <br />m <br />Q <br />Q <br />O <br />L <br />W <br />U <br />• O_ <br />N LC) <br />O 0 <br />LL <br />m <br />J C <br />O <br />ci (0 <br />O <br />Ln <br />>, (0 <br />7 <br />_• c <br />"X <br />O t~ <br />0- <br />0- <br />(0 <br />Q(0 C <br />O O <br />C c <br />O O <br />(0 <br />(0 (0 <br />N <br />• C <br />A A 'A A A A <br />16" water main along CR 510. <br />Removal or Grout Fill/Abandon of the existing <br />12" force main along CR 510. <br />Removal or Grout Fill/Abandon of the existing <br />Services to be provided (for each of four FPIDs) <br />Coordination with <br />Florida Dept. of Transportation (FDOT) <br />(0 <br />b. Indian River County Utilities <br />Florida Department of Environmental Protection <br />U <br />d. Sebastian River Improvement District <br />Development of a preliminary alignment along CR 510 and proposed tie-in locations for existing laterals <br />Detailed design (combination plan and profile) of: <br />16" water mains and associated connections and appurtenances along CR 510. <br />12" force main and associated connections and appurtenances along CR 510. <br />12" Reuse water mains and associated connections and appurtenances along CR 510. <br />(0 • U <br />