Laserfiche WebLink
ATTACHMENT B <br />REMARKS <br />1Perform Initial contact to obtain all existing as -built information from the <br />existing UA/O on the project <br />Follow up with UA/O for additional information, mark ups and <br />transmittal of plans to ensure no conflict with their existing utilities. <br />Assume 5 UAOs 2 hours per UAO <br />Assumes this was previously done for another FPID, thus only requires <br />revisions thereto <br />Prepare agenda, attend utility meeting, prepare minutes and follow up <br />(includes travel) <br />CADD <br />HOURS <br />TOTAL <br />HOURS <br />CO <br />0CNI <br />CO <br />46 <br />46 <br />NO. OF <br />SHEETS <br />SUBACTIVITY SUBTOTAL <br />SUBACTIVITY TOTAL <br />HOURS/ <br />UNIT <br />CO <br />N <br />N- <br />CO <br />NO. OF <br />UNITS <br />•- <br />LA <br />N- <br />N <br />BASIS <br />OF <br />ESTIMATE <br />LS <br />cn <br />J <br />cn <br />J <br />W <br />CACA <br />a <br />Initial Contact with Utility Agency Owner (UAO) <br />Coordination with UAO <br />Assisting with execution of constrution agreements <br />Attend Utility Meetings <br />s- <br />N <br />M <br />..+7 <br />