My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-123
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 3:16:30 PM
Creation date
7/14/2020 3:42:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/07/2020
Control Number
2020-123
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates
Subject
Replace Aging Reuse Control Panel at South County Regional Wastewater Treatment Plant
CCNA2018 Work Order 34
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />Task 1: Design Phase Services <br />Consultant will attend a kick-off meeting with IRCU to discuss the scope and phasing of <br />the project in order to define the final scope of work, approach to phasing, and <br />procurement approach. Consultant will perform on-site field measurements and data <br />collection needed for design. <br />Consultant will provide electrical design for the VFD installation and demolition of the <br />existing control panel and starters. Consultant will provide design for the PLC panel <br />modifications needed to implement and install new VFD's within the existing electrical <br />building and communicate with the SCADA system. <br />Consultant will review and coordinate VFD dimensional data from manufacturers which <br />will be used in the final design of the VFD replacement. Consultant will review the size <br />of the existing HVAC unit and equipment within the existing electrical building and <br />determine impacts to system based off added heat loads generated by the proposed VFDs. <br />Consultant will prepare and submit a brief technical memorandum (2-3 pages) that <br />summarizes the impacts with 6- and 18 -pulse VFD options with high level construction <br />cost estimates associated with each option. <br />Consultant will develop a control logic description which presents the proposed operation <br />for the reuse pump station under AUTO and MANUAL modes. The intent of the control <br />logic description is to provide the Contractor's integrator the information necessary to <br />program the station. <br />Consultant will provide 75% complete design deliverables consisting of progress <br />drawings, specifications, control logic and Opinion of Probable Construction Costs <br />(OPCC) for IRCU review. <br />Consultant will attend one (1) design review meeting. Consultant will incorporate IRCU <br />review comments. Consultant will provide final (100%) design deliverables, consisting <br />of drawings, specifications, control logic and OPCC. <br />Task 2: Bid Phase Services <br />Consultant will provide coordination with IRCU purchasing department for bidding the <br />proposed improvements. <br />Consultant will attend one (1) on-site pre-bid meeting and respond to reasonable number <br />of questions from potential bidders. It is anticipated that no more than two (2) <br />addendums will be issued as part of this project. <br />F:\Utilities\UTILITY - Engineering\WASTEWATER\WWTF - South Regional\20-0407-Reclaimed Pump VFD\Admin <br />\BCC Items\20200513 - DRAFT Scope - SWWTP RCP.docx Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.