Laserfiche WebLink
SCOPE OF SERVICES <br />Task 1: Design Phase Services <br />Consultant will attend a kick-off meeting with IRCU to discuss the scope and phasing of <br />the project in order to define the final scope of work, approach to phasing, and <br />procurement approach. Consultant will perform on-site field measurements and data <br />collection needed for design. <br />Consultant will provide electrical design for the VFD installation and demolition of the <br />existing control panel and starters. Consultant will provide design for the PLC panel <br />modifications needed to implement and install new VFD's within the existing electrical <br />building and communicate with the SCADA system. <br />Consultant will review and coordinate VFD dimensional data from manufacturers which <br />will be used in the final design of the VFD replacement. Consultant will review the size <br />of the existing HVAC unit and equipment within the existing electrical building and <br />determine impacts to system based off added heat loads generated by the proposed VFDs. <br />Consultant will prepare and submit a brief technical memorandum (2-3 pages) that <br />summarizes the impacts with 6- and 18 -pulse VFD options with high level construction <br />cost estimates associated with each option. <br />Consultant will develop a control logic description which presents the proposed operation <br />for the reuse pump station under AUTO and MANUAL modes. The intent of the control <br />logic description is to provide the Contractor's integrator the information necessary to <br />program the station. <br />Consultant will provide 75% complete design deliverables consisting of progress <br />drawings, specifications, control logic and Opinion of Probable Construction Costs <br />(OPCC) for IRCU review. <br />Consultant will attend one (1) design review meeting. Consultant will incorporate IRCU <br />review comments. Consultant will provide final (100%) design deliverables, consisting <br />of drawings, specifications, control logic and OPCC. <br />Task 2: Bid Phase Services <br />Consultant will provide coordination with IRCU purchasing department for bidding the <br />proposed improvements. <br />Consultant will attend one (1) on-site pre-bid meeting and respond to reasonable number <br />of questions from potential bidders. It is anticipated that no more than two (2) <br />addendums will be issued as part of this project. <br />F:\Utilities\UTILITY - Engineering\WASTEWATER\WWTF - South Regional\20-0407-Reclaimed Pump VFD\Admin <br />\BCC Items\20200513 - DRAFT Scope - SWWTP RCP.docx Page 2 of <br />