Laserfiche WebLink
Work Order No. 32 <br />Amendment 01 <br />HHW/Recycling Final <br />Design <br />Sub -Task 1.3 — Architect Coordination <br />Kimley-Horn will retain CMK Design Studio to preform Architectural services for the Project. This includes <br />MEP and Fire Protection design services. Kimley-Horn will perform the following services as part of this <br />task: <br />• Coordination of site plan with architect for building design. <br />• Coordination of structural engineering between Architect and Kimley-Horn. <br />• Coordination of water, sewer, and stormwater connections between MEP and Kimley-Horn. <br />• Coordination of deliverables and permit applications. <br />Deliverables: <br />Hard copies and electronic copy (.pdf) of signed and sealed Architectural Plans. <br />Sub -Task 1.4 — Solid Waste Consultant Coordination <br />Kimley-Horn will retain Special Waste Associates to preform Solid Waste Consulting services for the <br />Project. Kimley-Horn will perform the following services as part of this task: <br />• Coordination of plans and program between consultant and architect for building design. <br />Deliverables: <br />Hard copies and electronic copy (.pdf) of Consultant's report. <br />Sub -Task 1.5 — Civil Engineering Construction Documents <br />Based upon the Conceptual plans prepared by the Consultant under a separate agreement, the <br />Consultant will prepare Civil Engineering Construction Documents for the Project. These documents will <br />be submitted to regulatory agencies for review and permitting. Paving, Grading, and Drainage <br />Improvements are limited to those areas shown in the conceptual pans onsite and any expansion of the <br />Project area will be as an additional service. Water and Sewer improvements are limited to the <br />connection of the proposed buildings to the existing water and sewer mains on the Project site. Extension <br />of water and sewer mains, addition of pump stations, and/or offsite improvements required by agencies <br />can be designed as an additional service. <br />Deliverables: <br />Hard copies and electronic copy (.pdf) of: <br />Civil Engineering design drawings; <br />Design report; <br />Updated Engineer's Opinion of Probable Cost. <br />TASK 2 — STRUCTURAL ENGINEERING CONSTRUCTION DOCUMENTS <br />Based upon the Conceptual plans prepared by the Consultant under a separate agreement, the <br />Consultant will prepare Structural Engineering Construction Documents for the Project. These documents <br />will be submitted to regulatory agencies for review and permitting. <br />Under this task, Kimley-Horn will: <br />• Participate in coordination of the structural documents with architect, mechanical, electrical, and <br />plumbing disciplines within the overall coordination led by the architect. <br />Page 3 of 8 <br />