My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-113G
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-113G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 10:10:25 AM
Creation date
7/20/2020 2:12:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/09/2020
Control Number
2020-113G
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract Documents and Specifications
Area
58th Avenue, North of 57th Street to 85th Street
Project Number
IRC-1325
Bid Number
2020021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00310 -- Bid Form <br />PROJECT IDENTIFICATION: <br />Project Narne: 58T"AVENUE (FROM NORTH OF 57Th STREET TO 85Th <br />STREET) FULL DEPTH RECLAMATION <br />County Project Number: IRC -1325 <br />Bid Number: 2020021 <br />Project Address: 58th Avenue (North of 57th Street to 85Th Street) <br />Vero Beach, Florida 32967 <br />Project Description: The proposed improvements to 581' Avenue from <br />north of 57' Street to 85' Street and 69th Street from <br />Sta 11+84 to Sta 30+47 consist of reconstructing the <br />roadway utilizing full depth reclamation, milling and <br />resurfacing, widening the existing shoulders to 5 -feet, <br />structural asphalt, surface asphalt, drainage <br />improvements, waterline directional bore, utility <br />adjustments, signing, and pavement markings. This <br />project is an F.D.O. T. Small County Outreach Program <br />(SCOP) funded project, FM No. 436416-1-54-01 <br />THIS BID IS SUBMITTED TO: INDIAN RIVER COUNTY <br />1800 2711 Street <br />VERO BEACH, FLORIDA 32960 <br />1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an <br />Agreement with OWNER in the form included in the Bidding Documents to perform all Work <br />as specified or indicated in the Bidding Documents for the prices and within the times <br />indicated in this Bid and in accordance with the other terms and conditions of the Bidding <br />Documents. <br />2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and <br />Instructions to Bidders, including without limitation those dealing with the disposition of Bid <br />security. The Bid will remain subject to acceptance for 90 days after the Bid opening, or for <br />such longer period of time that Bidder may agree to in writing upon request of OWNER. <br />3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that: <br />A. Bidder has examined and carefully studied the Bidding Documents, the other related data <br />identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby <br />acknowledged. <br />Addendum Date Addendum Number <br />02.21.2020 1 <br />03.13.2020 2 <br />03.25.2020 <br />00310 - Bid Form REV 04-07 <br />00310- 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1325 58th Avenue (57th St to CR 510) Roadway Inventory\1- <br />Admin\Bids\Bid Documents\00310 - Bid Form REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.