Laserfiche WebLink
F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, tests, <br />studies, and data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-10, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 0610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); <br />6. Certificate of Substantial Completion (page 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of the Work (page 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor and Mapper's Certification as to Elevations and Locations of <br />the Work (page 00634-1); <br />9. General Conditions (pages 00700-1 to 700-45, inclusive); <br />10. Supplementary Conditions (pages 00800-i to 00800-11, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical <br />Provisions); <br />12. Drawings consisting of a cover sheet and sheets numbered 1 through 188, sheets S1 <br />through S46 and sheets T1 through T9, inclusive, with each sheet bearing the <br />following general title: 58th Avenue (57th St to 85th St) Reclamation Project. Water Main <br />Relocation Plans sheets numbered C0.0 through D1.1, inclusive; <br />00520 - Agreement (Public Works) REV 06-14.doc <br />00520-6 <br />H:\Bids\2019-2020 FY (2020000)\2020021 58th Ave FDR\00520 - Agreement (Public Works) REV 06-14.doc <br />