My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-113G
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-113G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 10:10:25 AM
Creation date
7/20/2020 2:12:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/09/2020
Control Number
2020-113G
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract Documents and Specifications
Area
58th Avenue, North of 57th Street to 85th Street
Project Number
IRC-1325
Bid Number
2020021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />CONTRACT FOR: 58T"AVENUE (FROM NORTH OF 57T" STREET TO 85T" STREET) FULL <br />DEPTH RECLAMATION <br />Project No. IRC -1325 <br />OWNER's Bid No. 2020021 <br />Project Description: The proposed improvements to 581h Avenue from north of 57th Street <br />to 85th Street and 691h Street from Sta 11+84 to Sta 30+47 consist of reconstructing the <br />roadway utilizing full depth reclamation milling and resurfacing widening the existing <br />shoulders to 5 -feet, structural asphalt surface asphalt drainage improvements waterline <br />directional bore, utility adjustments signing and pavement markings This project is an <br />F.D.O. T. Small County Outreach Program (SCOP) funded project FM No 436416-1-54-01. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To: <br />OWNER <br />And To: <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630-1 <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1325 58th Avenue (57th St to CR 510) Roadway Inventory\1- <br />Admin\Bids\Bid Documents\00630 - Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.