My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-113G
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-113G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 10:10:25 AM
Creation date
7/20/2020 2:12:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/09/2020
Control Number
2020-113G
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract Documents and Specifications
Area
58th Avenue, North of 57th Street to 85th Street
Project Number
IRC-1325
Bid Number
2020021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />Title <br />Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY....................................................................................................5 <br />1.01 Defined Terms...................................................................................................................................5 <br />1.02 Terminology......................................................................................................................................7 <br />ARTICLE 2 - PRELIMINARY MATTERS.....................................................................................................................8 <br />2.01 Delivery of Bonds..............................................................................................................................8 <br />2.02 Copies of Documents.......................................................................................................................8 <br />2.03 Commencement of Contract Times, Notice to Proceed..................................................................8 <br />2.04 Starting the Work..............................................................................................................................8 <br />2.05 Before Starting Construction............................................................................................................9 <br />2.06 Preconstruction Conference.............................................................................................................9 <br />2.07 Initial Acceptance of Schedules.......................................................................................................9 <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE...............................................................10 <br />3.01 Intent..................................................................................................................................................10 <br />3.02 Reference Standards........................................................................................................................10 <br />3.03 Reporting and Resolving Discrepancies..........................................................................................10 <br />3.04 Amending and Supplementing Contract Documents......................................................................10 <br />3.05 Reuse of Documents........................................................................................................................11 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; <br />REFERENCEPOINTS.............................................................................................................................11 <br />4.01 Availability of Lands..........................................................................................................................11 <br />4.02 Subsurface and Physical Conditions................................................................................................11 <br />4.03 Differing Subsurface or Physical Conditions....................................................................................12 <br />4.04 Underground Facilities......................................................................................................................12 <br />4.05 Reference Points..............................................................................................................................13 <br />4.06 Hazardous Environmental Condition at Site....................................................................................13 <br />ARTICLE 5 - BONDS AND INSURANCE....................................................................................................................15 <br />5.01 Performance, Payment, and Other Bonds.......................................................................................15 <br />5.02 Licensed Sureties and Insurers........................................................................................................15 <br />5.03 Certificates of Insurance...................................................................................................................15 <br />5.04 CONTRACTOR's Liability Insurance...............................................................................................15 <br />5.05 OWNER's Liability Insurance...........................................................................................................16 <br />5.06 Property Insurance............................................................................................................................16 <br />5.07 Waiver of Rights................................................................................................................................17 <br />5.08 Receipt and Application of Insurance Proceeds..............................................................................18 <br />5.09 Acceptance of Bonds and Insurance, Option to Replace................................................................18 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer.................................................................18 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES.................................................................................................19 <br />6.01 Supervision and Superintendence...................................................................................................19 <br />6.02 Labor, Working Hours.......................................................................................................................19 <br />6.03 Services, Materials, and Equipment.................................................................................................19 <br />6.04 Progress Schedule............................................................................................................................19 <br />6.05 Substitutes and "Or-Equals".............................................................................................................20 <br />6.06 Concerning Subcontractors, Suppliers, and Others.......................................................................21 <br />00700 - General Conditions REV 5-10-13 <br />00700-2 <br />F:\PublicWorks\ENGINEERINGDRqSIONPROJECTS\1325 58th Avmue (57th St to CR 510) Roadway Inventory\I-Admin\Bids\Bid Documents\00700 - General Conditions REV 5.10-13 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.