Laserfiche WebLink
EXHIBIT A <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />Geotechnical Engineering <br />Construction Materials Testing <br />Environmental Consulting <br />Indian River County Engineering Department <br />1801 276' Street, Building `A' <br />Vero Beach, Florida 32960 <br />Attention: Mr. Rob Skok <br />Infrastructure Project Manager <br />AACE Proposal No. P20-1644 <br />June 25, 2020 <br />Revised July 1, 2020 <br />Subject: PROPOSAL FOR CONSTRUCTION MATERIALS TESTING <br />58TH AVENUE (577- STREET TO 85TH STREET) FULL DEPTH RECLAMATION PROJECT <br />FM No. 436416-1-54-01 <br />IRC PROTECT No. 1325 <br />INDIAN RIVER COUNTY, FLORIDA <br />Dear Mr. Skok: <br />Andersen Andre Consulting Engineers, Inc. (AACE) is pleased to present this proposal for construction <br />materials testing services during improvements to a portion of 58d Avenue, as indicated above. The purpose <br />of our services, as discussed further herein, will be to provide materials testing in general accordance with the <br />project plans and technical specifications. <br />BACKGROUND INFORMATION <br />We understand that the proposed improvements to 58`s Avenue consist of refurbishing (through the Full <br />Depth Reclamation (FDR) process) the roadway from STA 418+76 to STA 593+03 (approximately 3.3 miles) <br />as well as widening 69"' Street to the east and west of 58h Avenue (from STA 12+74.10 to STA 31+15.88, <br />approximately 0.34 miles). The project also includes drainage improvements and the signalization of the <br />intersection of 58a' Avenue and 69th Street. Testing associated with the relocation of a 20" water main will <br />be coordinated with the County's utility department. <br />Further, we understand that this is an FDOT Small County Outreach Program (SCOP). Therefore, based <br />on our understanding of the project and on our conversations with the FDOT State Materials Office, the <br />quality control measures listed in the FDOT's Developmental Specification T332 Full Depth Reclamation should <br />be adhered to. A project duration of approximately 1 year has been established by Indian River County. <br />- Balance of page intentionally left blank - <br />834 SW Swan Avenue, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com <br />