Laserfiche WebLink
58TH AVENUE <br />FM No. 436416-1-54-01 <br />IRC PRojEcr No. 1325 <br />AACE Proposal No. P20-1644 <br />ITEM #1: Field and Lab Testing of FDR Roadwav Base and Shoulders and Roadway Widenin <br />Page -4- <br />• Road Base Particle Size Analysis of Pulverized Base: <br />Washed Sieve Analyses; 25 tests @ $95.00/test.................................... <br />$2,375.00 <br />Sample Preparation; 25 tests @ $35.00/test........................................ <br />$875.00 <br />• Marshall Stability of FDR Mixture: 20 tests @ $150.00/ test ............................ <br />$3,000.00 <br />• Moisture/Density Relationship (Proctor) Testing: 25 tests @ $85.00/test ................. <br />$2,125.00 <br />• LBR Testing; 25 tests @ $315.00/test.............................................. <br />$7,875.00 <br />• In -Place Density Testing of FDR Mix and Refurbished Shoulders; <br />$4,956.00 <br />- 75 tests @ $24.00/test (minimum 4 tests per hour, per trip) ........................... <br />$1,800.00 <br />• In -Place Density Testing of Roadway Widening Stabilized Subgrade (69`}' Street); <br />$1,050.00 <br />- 40 tests @ $24.00/test (minimum 4 tests per hour, per trip) ............................ <br />$960.00 <br />• In -Place Density Testing of Roadway Embankment (as needed); <br />- 30 tests @ $24.00/test (minimum 4 tests per hour, per trip) ............................ <br />$720.00 <br />• Engineering Technician (man-hours for sample collection, limited standby, etc.) <br />- 80 hours @ $59.00/hour.......................................................4 <br />7$ , 20.00 <br />Item #1 Subtotal: ............................... $24,450.00 <br />ITEM #2: QC Services During Paving Operations <br />• Asphalt Plant Inspection - Senior Transportation/Roadway Technician; <br />- 2 Days x 10 hours/day @ $75.00/hr. x 1.5 (nighttime testing rate) ..................... <br />$2,250.00 <br />- Asphalt Content and Extraction/Gradation Testing; 7 samples x $200.00/sample ........ <br />$1,400.00 <br />• Roadway Coring (7 Coring Events) <br />- Engineering Technician (for Roadway Coring - 2 techs. required for all coring); <br />7 events @ 6 hours/event x @ $59.00/hour x 2 technicians ........................ <br />$4,956.00 <br />- Coring Mobilization; 7 events x $100.00/mob...................................... <br />$700.00 <br />- Core Machine Usage; 7 events x $150.00/ day ...................................... <br />$1,050.00 <br />- Generator Usage; 7 events x $50.00/day........................................... <br />$350.00 <br />- Specific Gravity Testing (Unit Weight) of Cores; 21 cores x $35.00/core.................$735.00 <br />Item #2 Subtotal: ................................ $11,441.00 <br />► ITEM #3: Drainage Construction <br />• Proctor Testing. 6 tests @ $85.00/test.............................................. $510.00 <br />• In -Place Density Testing of Excavation Backfill; <br />- 125 tests @ $24.00/test (minimum 4 tests per hour, per trip)..' ........................ $3,000.00 <br />• Engineering Technician (man-hour estimate for road closure standby, etc.) <br />-12 hours @ $59.00/hour........................................................7$ 08.00 <br />Item #3 Subtotal: ................................ $4,218.00 <br />- Balance of page intenfionalyleft blank - <br />