My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-129
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 2:46:30 PM
Creation date
7/20/2020 4:16:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/14/2020
Control Number
2020-129
Agenda Item Number
8.G.
Entity Name
Andersen Andre Consulting Engineers, Inc.
Subject
Construction Materials Testing, Work Order Number 3
Area
58th Avenue, 57th Street to 85th Street
Project Number
IRC-1325
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
58TH AVENUE <br />FM No. 436416-1-54-01 <br />IRC PRojEcr No. 1325 <br />AACE Proposal No. P20-1644 <br />ITEM #1: Field and Lab Testing of FDR Roadwav Base and Shoulders and Roadway Widenin <br />Page -4- <br />• Road Base Particle Size Analysis of Pulverized Base: <br />Washed Sieve Analyses; 25 tests @ $95.00/test.................................... <br />$2,375.00 <br />Sample Preparation; 25 tests @ $35.00/test........................................ <br />$875.00 <br />• Marshall Stability of FDR Mixture: 20 tests @ $150.00/ test ............................ <br />$3,000.00 <br />• Moisture/Density Relationship (Proctor) Testing: 25 tests @ $85.00/test ................. <br />$2,125.00 <br />• LBR Testing; 25 tests @ $315.00/test.............................................. <br />$7,875.00 <br />• In -Place Density Testing of FDR Mix and Refurbished Shoulders; <br />$4,956.00 <br />- 75 tests @ $24.00/test (minimum 4 tests per hour, per trip) ........................... <br />$1,800.00 <br />• In -Place Density Testing of Roadway Widening Stabilized Subgrade (69`}' Street); <br />$1,050.00 <br />- 40 tests @ $24.00/test (minimum 4 tests per hour, per trip) ............................ <br />$960.00 <br />• In -Place Density Testing of Roadway Embankment (as needed); <br />- 30 tests @ $24.00/test (minimum 4 tests per hour, per trip) ............................ <br />$720.00 <br />• Engineering Technician (man-hours for sample collection, limited standby, etc.) <br />- 80 hours @ $59.00/hour.......................................................4 <br />7$ , 20.00 <br />Item #1 Subtotal: ............................... $24,450.00 <br />ITEM #2: QC Services During Paving Operations <br />• Asphalt Plant Inspection - Senior Transportation/Roadway Technician; <br />- 2 Days x 10 hours/day @ $75.00/hr. x 1.5 (nighttime testing rate) ..................... <br />$2,250.00 <br />- Asphalt Content and Extraction/Gradation Testing; 7 samples x $200.00/sample ........ <br />$1,400.00 <br />• Roadway Coring (7 Coring Events) <br />- Engineering Technician (for Roadway Coring - 2 techs. required for all coring); <br />7 events @ 6 hours/event x @ $59.00/hour x 2 technicians ........................ <br />$4,956.00 <br />- Coring Mobilization; 7 events x $100.00/mob...................................... <br />$700.00 <br />- Core Machine Usage; 7 events x $150.00/ day ...................................... <br />$1,050.00 <br />- Generator Usage; 7 events x $50.00/day........................................... <br />$350.00 <br />- Specific Gravity Testing (Unit Weight) of Cores; 21 cores x $35.00/core.................$735.00 <br />Item #2 Subtotal: ................................ $11,441.00 <br />► ITEM #3: Drainage Construction <br />• Proctor Testing. 6 tests @ $85.00/test.............................................. $510.00 <br />• In -Place Density Testing of Excavation Backfill; <br />- 125 tests @ $24.00/test (minimum 4 tests per hour, per trip)..' ........................ $3,000.00 <br />• Engineering Technician (man-hour estimate for road closure standby, etc.) <br />-12 hours @ $59.00/hour........................................................7$ 08.00 <br />Item #3 Subtotal: ................................ $4,218.00 <br />- Balance of page intenfionalyleft blank - <br />
The URL can be used to link to this page
Your browser does not support the video tag.