Laserfiche WebLink
2. The existing Article 1 — SCOPE OF WORK of the Contract is modified to include the <br />following: <br />A. LANDFILL GAS SYSTEM OPERATION AND MAINTENANCE. The <br />Contractor shall provide the additional annual landfill gas system O&M services in <br />accordance with the attached proposal from SCS Field Services. <br />a. Landfill Gas Well Dewatering Pumps — Provide the labor, equipment and <br />materials to install thirteen (13) new QED AP -4+ bottom loading <br />pneumatics pumps and hardware as well as removal, relocation and <br />installation of five (5) existing pneumatic pumps. Upon installation, activate <br />the pumps and check proper operations. <br />b. Landfill Gas Credit Monitoring — Provide assistance with submittal of <br />historical data, provide additional weekly flare readings and perform <br />additional flow meter calibration in order to assist SWDD with obtaining <br />carbon credits with the flaring of the landfill gas. <br />3. The existing Article 3 — COMPENSATION of the Contract is modified to include the <br />following: <br />iii) Annual Payment to Contractor for Landfill Gas System O&M shall be <br />increased by $13,090 for the period of July 1, 2020 through December 31, <br />2020 or $2,181.67 per month for the next six (6) months, which includes a <br />10% management fee to Contractor. The overall payment for Calendar Year <br />2020 Non -Class 1 Landfill services shall be adjusted from the current <br />$3,104,585.94 per year to $3,117,675.94 or $260,897.17 per month for the next <br />six (6) months. <br />v) A lump -sum payment of $91,470.50, which includes a 10% management fee <br />to Contractor, for the Non -Routine Services and Maintenance of the Landfill <br />Gas System. <br />4. Ratification. Except as specifically provided in this Fourteenth Amendment, all other <br />provisions of the Contract shall remain in full force and effect. <br />[signature page follows] <br />Fourteenth Amendment to Contract Page 2 of 3 <br />