My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-132
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 3:07:35 PM
Creation date
7/20/2020 4:44:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/14/2020
Control Number
2020-132
Agenda Item Number
15.B.2.
Entity Name
Republic Services of Florida
Subject
Fourteenth Amendment to Contract Agreement
Area
Solid Waste Operations and Maintenance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCS FIELD SERVICES Environmental <br />Consulting & Contracting <br />x <br />June 25, 2020 <br />Brian Lewis <br />Landfill Operations Manager <br />Republic Services <br />1327 74« Ave SE <br />Vero Beach, FL 32968 <br />Subject: Proposal to Provide Landfill Gas Credit Monitoring <br />Indian River Landfill, Vero Beach, Florida <br />Dear Mr. Lewis: <br />SCS Field Services (SCS -FS) is pleased to provide this proposal to you for the subject work. SCS -FS is <br />prepared to schedule the work immediately upon receipt of approval. The scope of work and <br />budgetary estimate is outlined below. <br />SCOPE OF WORK <br />Task 1: 2019 & 2020 Historical Data <br />Based on conversations between SCS -FS and Element Markets (EM), SCS -FS will provide historical <br />documentation of gas meter and flow meter calibration certificates, flare station chart recorder data <br />in excel format and flare station landfill gas readings for the entire year of 2019 and year to date for <br />2020. <br />Task 2: Weekly Flare Readings <br />Based on discussion with Republic Services (RS), Indian River County (County) and representatives <br />from EM, SCS -FS will perform additional flare station landfill gas readings as necessary to fulfill <br />monitoring on a weekly basis. Currently SCS -FS performs scheduled flare readings twice per month. <br />Additional weekly flare readings will be performed as needed on weeks that are not scheduled for a <br />flat fee. Once per quarter during weekly site visits the flow meter will be cleaned and inspected. All <br />flare readings will be taken with a factory calibrated GEM 5000 portable landfill gas meter or an <br />equivalent instrument. During weekly flare readings, the gas meter will be field calibrated with a <br />50% methane/35% carbon dioxide calibration mix and 4% oxygen. <br />Task 3: Flow Meter Calibration <br />The flare station flow meter is factory calibrated once per year per the RS standard operating <br />procedure. To minimize risk of drift outside the 5% tolerance SCS -FS recommends factory calibrating <br />the flow meter every 6 months and performing an "as found" bench test prior to calibration as an <br />alternative to quarterly field accuracy checks. During each calibration, a loaner unit will be installed <br />by SCS -FS. Once the site meter is calibrated, the loaner meter will be removed and the site meter re - <br />19{X} NW Corporate Ave, Suite E300, Boca Eaton, Florida 33431 co <br />
The URL can be used to link to this page
Your browser does not support the video tag.