My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-134
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 3:08:52 PM
Creation date
7/21/2020 11:21:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/20/2020
Control Number
2020-134
Agenda Item Number
County Administrator
Entity Name
MBV Engineering, Inc.
Subject
Jackie Robinson Training Complex (FKA Historic Dodgertown) Walking Trail,
Amendment 1 to work order 10
Project Number
IRC-1908
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and the proposed impact area and associated acreages. The extent of the surface waters and <br />impacts are measured at the top of bank. [62-330.060(2), F.A.C., 62-330.301(1)(d)(f), F.A.C.; 62- <br />340.600(2)(d), F.A.C.; 10.0 —10.3, A.H. Vol 1] <br />5. As requested previously in comment 6 of the District's April 10, 2020, RAI letter, please indicate <br />on the plans how flow will be maintained during the installation and removal of the temporary <br />drainage culvert. Include on the plans appropriate BMP's during the installation and removal <br />process so as to prevent a violation of the state water quality standards. [62-330.301(1)(d) <br />through (f), F.A.C.; 10.2.7 (a), A.H. Volume 1] <br />6. As requested previously in comment 7 of the District's April 10, 2020 RAI letter, the application <br />fee for the proposed project is $2,110; however, $1,190 was submitted with your application. <br />Please submit the remaining $920 balance online or by check made payable to the St. Johns <br />River Water Management District. [62-330.071, F.A.C.; 40C- 1.603(5), F.A.C.] <br />Please note that the comment No. 3 in the attached RAI provides for an alternate capacity analysis <br />option of the existing wet pond to provide information to the District that the proposed new <br />impervious area associated with this project is within the existing permitted impervious area threshold <br />of permit No. 40-061-123418-1, due to Aviation Blvd. improvements not being constructed. This <br />contract reflects electing this alternate option to address comment No. 3 and does not include Master <br />ICPR Re -Modeling of the existing pond system nor design and modeling of additional stormwater <br />ponds. <br />EXHIBIT B - FEE SCHEDULE <br />The COUNTY agrees to pay and the Consultant agrees to accept for services rendered, pursuant to this <br />Agreement, fees inclusive of expenses in accordance with the following: <br />Task Fee <br />Address SJRWMD Comments $ 3,000 <br />SIRWMD Application Fee Balance $ 920 <br />Work Authorization Total $ 3,920 <br />
The URL can be used to link to this page
Your browser does not support the video tag.