My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116D-2
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116D-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:31:29 PM
Creation date
7/28/2020 3:30:18 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PAGE 1 OF 1 <br />DATE: May 15, 2020 <br />FROM: REI Engineers <br />REFERENCE: Specification and Drawing Update for Addendum No. 3 <br />Indian River County <br />IRC-1838 Indian River County Main Library Roof Replacement <br />This addendum forms a part of the Contract Documents and modifies the original Bidding Documents, including <br />changes to the specifications and drawings as follows: <br />CHANGES TO SPECIFICATIONS: <br />1. Replace Specification Section ““07 01 50 Preparation for Reroofing” with attached “07 01 50 Preparation <br />for Reroofing (Revision No. 1)”. Specification section has been updated to clarify the existing single ply <br />attachment method and drainage requirements. <br />2. Replace Specification Section ““07 52 16 Modified Bitumen Roofing” with attached “07 52 16 Modified <br />Bitumen Roofing (Revision No. 1)”. Specification section has been updated to clarify product <br />requirements. <br />CHANGES TO DRAWINGS: <br />1. Replace Specification Section “Contract Drawing R1” with attached “Contract Drawing R1 (Revision No. <br />1)”. Contract drawing has been updated to clarify electrical conduit flashing requirements. <br />2. Replace Specification Section “Contract Drawing R2 (Revision No. 1)” with attached “Contract Drawing <br />R2 (Revision No. 2)”. Contract drawing has been updated to clarify wind pressure designation. <br />3. Replace Specification Section “Contract Drawing D2” with attached “Contract Drawing D2 (Revision No. <br />1)”. Contract drawing has been updated to clarify electrical conduit flashing requirements. <br />ALL OTHER REQUIREMENTS AND PROVISIONS OF THE BIDDING DOCUMENTS REMAIN UNCHANGED. <br />ACKNOWLEDGE RECEIPT OF THIS ADDENDUM ON THE BID FORM. FAILURE TO DO SO MAY BE <br />CAUSE FOR REJECTION OF THE BID. <br />END OF ADDENDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.