Laserfiche WebLink
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 05 31 23-7 Steel Roof Deck Repair <br />K. Deck openings greater than 12” with steel framing around the perimeter of the opening: <br />1. Fasten deck to framing 6" on centers (fasten each rib) around the perimeter of the <br />opening. <br />2. Where steel deck is parallel to steel framing, the deck rib shall bear completely on <br />the steel framing. Fasten the deck 6" on centers along the rib that bears on the <br />steel framing. <br />3. Contractor shall install steel framing for full deck contact and support around the <br />perimeter of the opening. <br />4. Where gaps exist around penetration/equipment, cut sheet metal to conform to <br />conditions and fasten to top flange of deck to ensure proper support of above-deck <br />roofing components. <br />3.6 FIELD QUALITY CONTROL <br />A. Contractor shall monitor the inside of the building at all times during removal and <br />replacement of damaged steel decking to prevent damage to building, equipment and <br />occupancy. <br />B. Contractor shall monitor all hot work operations in strict accordance with the Owners <br />requirements and local Code. These operations include, but are not limited to, cutting, <br />welding, soldering, brazing, grinding, etc. and any and all other spark or flame producing <br />operations. <br />END OF SECTION 05 31 23