My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116D-2
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116D-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:31:29 PM
Creation date
7/28/2020 3:30:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
06/23/2020
Control Number
2020-116D-1
Agenda Item Number
8.N.
Entity Name
Atlantic Roofing
Main Library
Subject
Replacement Roof
Project Number
IRC-1838
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 07 52 16-9 Modified Bitumen Roofing (Revision 1) <br />Provide a continuous bead of sealant along outside edge of termination bar. <br />6. Sheet metal incorporated into the roofing system shall be sealed off with stripping <br />ply. Stripping plies shall be installed in roof cement and fit tight to the edge of the <br />sheet metal. The stripping ply shall extend four inches beyond sheet metal onto <br />roof membrane. Stripping ply shall be installed prior to application of surface ply. <br />7. Provide sealant installed to fill void between edge of sheet metal and surface ply <br />edge (i.e. at metal edge, pipe penetrations, etc.) properly tooled to ensure <br />adhesion and slope to shed water. Broadcast granules into properly installed <br />sealant. <br />G. Fluid Applied Flashing Application <br />1. Using masking tape, mask the perimeter of the area to receive the flashing system. <br />Apply resin primer to substrates requiring additional preparation and allow primer <br />to set. <br />2. Pre-cut fleece to ensure a proper fit at transitions and corners prior to membrane <br />application. <br />3. Refer to manufacturer’s installation instructions for application rates and additional <br />installation information. <br />4. Broadcast granules into horizontal surface of fluid to match adjacent surface ply. <br />H. Roof Drain <br />1. Provide roof drain flashings as indicated in detail drawing. Refer to the above <br />requirements for fluid applied flashings. <br />2. Refer to Section 22 14 00. <br />I. Retrofit Roof Drain <br />1. Adhere base ply in full bed of solvent free adhesive around drain bowl. <br />2. Install retrofit roof drain according to manufacturer’s installation instructions and <br />strip-in with stripping membrane to extend 4” beyond drain flange. <br />3. Provide fluid applied flashing as shown in the contract drawings and indicated <br />above. <br />4. Refer to Section 22 14 00. <br />J. Walk Pad Material <br />1. Apply walk pad material to a clean, dry surface. <br />2. Prior to application, cut walk pad material into maximum 5’ lengths and allow to <br />relax until flat. A straight edge or chalk line should be used to ensure straight <br />square cuts. Do not cut the walk pad material directly on the roof surface. <br />3. Position walk pad material so as to leave minimum 2” gaps between panels to <br />allow for proper drainage. <br />4. Adhere walk pad panels to surface ply with roof cement applied to the back of the <br />panels in spots approximately 5” square. Use a notched trowel to keep the cement <br />3/8” thick. <br />5. Walk-in each panel to ensure complete contact with the membrane surface. <br />6. Provide walk pads at the following locations: <br />a. Around roof hatches. <br />b. Around HVAC units. <br />K. Ponding Water: The ponding of any water on the roof surface after installation of the roofing <br />system is not acceptable and will be grounds for rejection of the roof. Ponding is herein <br />defined as precipitation remaining in a four square foot area or larger, 1/4 inch or deeper <br />for a period of 24 hours from the termination of precipitation. Contractor shall not apply <br />surface ply until verification of proper drainage has been determined. Contractor shall be <br />responsible for modifications to roof system to ensure proper drainage including but not
The URL can be used to link to this page
Your browser does not support the video tag.