Laserfiche WebLink
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 07 72 00-1 Roof Accessories <br />SECTION 07 72 00 <br />ROOF ACCESSORIES <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Provide roof accessory assemblies as indicated and required by the Contract Drawings: <br />1. Provide pipe supports for all rooftop conduit, gas lines, electrical lines, condensa- <br />tion lines, etc. <br />2. Provide PVC pipe to route condensation from HVAC p-traps to nearest drainage <br />point. <br />3. Provide one-way moisture relief vents. <br />1.2 RELATED SECTIONS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Specification Sections, apply to this Section, including but not limited to: <br />1. Modified Bitumen Roofing Section 07 52 16 <br />1.3 SUBMITTALS <br />A. Refer to Section 01 33 00-Submittal Procedures. <br />B. Manufacturer’s Product Data Sheets for all materials specified certifying material com- <br />plies with all specified requirements. <br />C. Latest edition of the Manufacturer’s current material specifications and installation in- <br />structions. <br />D. Shop Drawings of fixed interior ladder. <br />1.4 DELIVERY, STORAGE, AND HANDLING <br />A. Packing and Shipping: Deliver materials to site in Manufacturer's original unopened <br />packaging with labels intact. <br />B. Storage: Adequately protect against damage while stored at the site. <br />C. Handling: Comply with Manufacturer's instructions. <br />1.5 PROJECT CONDITIONS <br />A. Field Measurements: Verify all dimensions required. <br />1.6 WARRANTIES <br />A. All roof accessories provided through roof system manufacturer shall be included in the <br />specified roof system manufacturer’s warranty. <br />PART 2 PRODUCTS <br />2.1 MATERIALS <br />A. One-way moisture relief vents: Shall be of spun aluminum construction (plastic vents are