Laserfiche WebLink
IRC BID #2020039 Unit Item Cost Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />SCHEDULE "A" <br />Company Name: Blue Goose Construction LLC <br />Item <br />No. <br />Description <br />I <br />Quantity <br />Unit <br />Material Unit <br />Price (Furnish) <br />Unit Price to <br />Install <br />Total Unit Price <br />(Furnish + Installation) <br />A35 <br />Water Services Additional Footage <br />(a) <br />1" HDPE Water Service <br />1 <br />L.F. <br />$ <br />1.32 <br />$ <br />9.18 <br />$ <br />10.50 <br />(b) <br />2" HDPE Water Service <br />1 <br />L.F. <br />$ <br />1.98 <br />$ <br />12.27 <br />$ <br />14.25 <br />A36 <br />Water Services saddle size adjustments <br />(constructed on water main 6" or larger) <br />(a) 6" <br />1 <br />EA. <br />$ <br />105.00 <br />$ <br />1.00 <br />$ <br />105.00 <br />(b) 8" <br />1 <br />EA. <br />$ <br />118.00 <br />$ <br />1.00 <br />$ <br />118.00 <br />(c) 10" <br />1 <br />EA. <br />$ <br />118.00 <br />$ <br />1.00 <br />$ <br />118.00 <br />(d) 12" <br />1 <br />EA. <br />$ <br />136.00 <br />$ <br />1.00 <br />$ <br />136.00 <br />(e) 16" <br />1 <br />EA. <br />$ <br />195.00 <br />$ <br />1.00 <br />$ <br />195.00 <br />A37 <br />Blow -off Assembly <br />1 <br />EA. <br />$ <br />858.00 <br />$ <br />877.00 <br />$ <br />1,735.00 <br />A38 <br />Fire Hydrant Assembly (includes tee) <br />(constructed with new water main) <br />1 <br />EA. <br />$ <br />3,256.00 <br />$ <br />1,644.00 <br />$ <br />4,900.00 <br />A39 <br />Fire Hydrant Assembly <br />(constructed on existing water main) <br />1 <br />EA. <br />$ <br />2,481.60 <br />$ <br />588.40 <br />$ <br />3,070.00 <br />A40 <br />Bacteriological Sample Point <br />(constructed on new water main) <br />1 <br />EA. <br />$ <br />132.00 <br />$ <br />418.00 <br />$ <br />550.00 <br />A41 <br />Bacteriological Sample Point <br />(using a water service or fire hydrant) <br />1 <br />EA. <br />$ <br />44.00 <br />$ <br />206.00 <br />$ <br />250.00 <br />A42 <br />2" Manual Air Release Valve <br />1 <br />EA. <br />$ <br />1,218.80 <br />$ <br />766.20 <br />$ <br />1,985.00 <br />A43 <br />2" Automatic Air Release Valve <br />1 <br />EA. <br />$ <br />2,450.80 <br />$ <br />934.20 <br />$ <br />3,385.00 <br />A44 <br />Dewatering <br />(a) 0'-6' <br />1 <br />L.F. <br />NA <br />$ <br />8.00 <br />$ <br />8.00 <br />(b) 6'-12' <br />1 <br />L.F. <br />NA <br />$ <br />10.00 <br />$ <br />10.00 <br />(c) 12'-18' <br />1 <br />L.F. <br />NA <br />$ <br />15.00 <br />$ <br />15.00 <br />A45 <br />Remove Pressure Pipe <br />(a) 3" <br />1 <br />L.F. <br />NA <br />$ <br />1.00 <br />$ <br />1.00 <br />(b) 4" <br />1 <br />L.F. <br />NA <br />$ <br />2.00 <br />$ <br />2.00 <br />(c) 6" <br />1 <br />L.F. <br />NA <br />$ <br />5.00 <br />$ <br />5.00 <br />(d) 8" <br />1 <br />L.F. <br />NA <br />$ <br />5.00 <br />$ <br />5.00 <br />(e) 10" <br />1 <br />L.F. <br />NA <br />$ <br />5.00 <br />$ <br />5.00 <br />(f) 12" <br />1 <br />L.F. <br />NA <br />$ <br />10.00 <br />$ <br />10.00 <br />(g) 16" <br />1 <br />L.F. <br />NA <br />$ <br />15.00 <br />$ <br />15.00 <br />(h) Cost Credit <br />1 <br />L.F. <br />NA <br />$ <br />- <br />$ <br />- <br />7of13 <br />