My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-124D
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-124D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 3:23:16 PM
Creation date
8/3/2020 4:06:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/07/2020
Control Number
2020-124D
Agenda Item Number
8.M.
Entity Name
CK Contractors and Development, LLC
Subject
2020 Agreement Utility Services; construction/repair water services RFP 2020039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC BID #2020039 Unit Item Cast Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />SCHEDULE"A" <br />Company Name: CK Contractors and Development, LLC. <br />Item <br />No• <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price (Furnish) <br />Unit Price to <br />Instal! <br />Total Unit Price <br />(Furnish + Installation) <br />SECTION <br />B - Restoration <br />B1 <br />Pavement Repair and Replacement <br />(a) Asphalt Road <br />1 <br />S.Y. <br />$ <br />19.57 <br />$ <br />24.64 <br />$ <br />44.21 <br />(b) Asphalt Driveway <br />1 <br />S.Y. <br />$ <br />20.60 <br />$ <br />24.64 <br />$ <br />45.24 <br />(c) Asphalt Millings <br />1 <br />S.Y. <br />$ <br />6.18 <br />$ <br />24.64 <br />$ <br />30.82 <br />(d) Asphalt overlay <br />1 <br />S.Y. <br />$ <br />4.64 <br />$ <br />14.00 <br />$ <br />18.64 <br />(e) Add. S-3 Asphalt <br />1 <br />Ton <br />$ <br />108.15 <br />$ <br />72.80 <br />$ <br />180.95 <br />(f) lCold Mix Asphalt <br />1 <br />Ton <br />$ <br />77.25 <br />$ <br />22.40 <br />$ <br />99.65 <br />(g) Concrete Driveway (6") <br />1 <br />S.Y. <br />$ <br />46.35 <br />$ <br />11.20 <br />$ <br />57.55 <br />(h) Concrete Sidewalk (4") <br />1 <br />S.Y. <br />$ <br />36.05 <br />$ <br />11.20 <br />$ <br />47.25 <br />(i) Concrete Curb <br />1. Curb and Gutter <br />1 <br />L.F. <br />$ <br />17.51 <br />$ <br />7.84 <br />$ <br />25.35 <br />2. 'D' Curb <br />1 <br />L.F. <br />$ <br />16.48 <br />$ <br />3.36 <br />$ <br />19.84 <br />(jj Concrete Driveway Paver Block <br />1 <br />S.Y. <br />$ <br />43.26 <br />$ <br />8.96 <br />$ <br />52.22 <br />(k) Lime rock Driveway <br />1 <br />S.Y. <br />$ <br />18.03 <br />$ <br />8.40 <br />$ <br />26.43 <br />(I) jAsphalt sidewalk <br />1 <br />S.Y. <br />$ <br />18.54 <br />$ <br />28.00 <br />$ <br />46.54 <br />B2 <br />Milling Asphalt <br />1 <br />S.Y. <br />$ <br />5.15 <br />$ <br />16.80 <br />$ <br />21.95 <br />B3 <br />Coquina Rock Base <br />1 <br />C.Y. <br />$ <br />14.94 <br />$ <br />8.96 <br />$ <br />23.90 <br />B4 IFlowable <br />Fill <br />(a) 0 - 4 cy (include short load fees) <br />1 <br />C.Y. <br />$ <br />169.95 <br />$ <br />22.40 <br />$ <br />192.35 <br />(b) 4 - 8 cy (include short load fees) <br />1 <br />C.Y. <br />$ <br />159.65 <br />$ <br />20.16 <br />$ <br />179.81 <br />(c) > 8cy <br />1 <br />C.Y. <br />$ <br />139.05 <br />$ <br />17.92 <br />$ <br />156.97 <br />B5 <br />Miscellaneous Materials <br />(a) ISand <br />1 <br />C.Y. <br />$ <br />7.21 <br />$ <br />28.00 <br />$ <br />35.21 <br />(b) IFill <br />1 <br />C.Y. <br />$ <br />5.67 <br />$ <br />39.20 <br />$ <br />44.87 <br />(c) 1#57 Rock <br />1 <br />C.Y. <br />$ <br />30.90 <br />$ <br />35.84 <br />$ <br />66.74 <br />(d)Shell Rock <br />1 <br />C.Y. <br />$ <br />28.84 <br />$ <br />35.84 <br />$ <br />64.68 <br />(e) ISuremix Concrete 80# <br />1 <br />Bag <br />$ <br />11.02 <br />$ <br />13.44 <br />$ <br />24.46 <br />86 <br />Sod Replacement <br />(a) jBahia <br />1 <br />S.Y. <br />$ <br />1.08 <br />$ <br />1.18 <br />$ <br />2.26 <br />(b) <br />Floratam <br />1 <br />S.Y. <br />$ <br />2.16 <br />$ <br />2.30 <br />$ <br />4.46 <br />B7 <br />Seed and Mulch <br />1 <br />S.Y. <br />$ <br />1.60 <br />$ <br />1.74 <br />$ <br />3.33 <br />B8 <br />Mailbox Removal and Reinstallation <br />1 <br />EA <br />$ <br />10.30 <br />$ <br />140.00 <br />$ <br />150.30 <br />B9 <br />Sprinkler System Repair per Yard <br />1 <br />EA <br />$ <br />103.00 <br />$ <br />140.00 <br />$ <br />243.00 <br />B10 <br />Handicap Ramp Restoration <br />1 <br />EA <br />$ <br />901.25 1 <br />$ <br />1,512.00 <br />$ <br />2,413.25 <br />10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.