My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/11/1995
CBCC
>
Meetings
>
1990's
>
1995
>
4/11/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:22:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/11/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOBART LANDING WATER LINE REPLACEMENT - <br />DRIVEWAYS. INC. <br />The Board reviewed a Memorandum of March 28, 1995: <br />DATE: MARCH 28, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATO <br />FROM: TE G. j <br />DI OF ICES <br />PREPARED H. R, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: HOBART LANDING WATER LINE REPLACEMENT <br />WORK AUTHORIZATION NO. 30 <br />INDIAN RIVER COUNTY BID NO. 4007 <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -21 -DS <br />BACKGROUND <br />The existing water distribution lines at Hobart Landing are <br />galvanized lines and asbestos -cement pipe (ACP). The distribution <br />system is to be replaced with PVC pipe due to excessive corrosion <br />and pressure problems. <br />ANALYSIS <br />The project is to be completed by our in-house labor contractor, <br />Driveways, Inc., at a labor cost of $75,794.48; the cost of <br />materials is $29,026.84. The total project construction cost is <br />$104,821.32. Design will be in-house. <br />The Department of Utility Services recommends approval of the <br />subject project and of Work Authorization No. 30 to complete the <br />above -referenced project. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously <br />approved the Hobart Landing Water Line <br />Replacement Work Authorization No. 30 with <br />Driveways, Inc., at a total cost of <br />$104,821.32, to complete the project, as <br />recommended by staff in the memorandum. <br />AGREEMENT.IS ON FILE IN THE <br />OFFICE OF THE CLERK TO THE BOARD <br />25 BOOK 94 F'AGF 84 <br />April 11, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.