My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2020
CBCC
>
Meetings
>
2020's
>
2020
>
07/07/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 2:15:38 PM
Creation date
8/12/2020 1:15:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 24 <br />FI,ORIPA POWER & LIGFITCOMTRANY <br />Attachment A <br />Third Revised Sheet No. 9.045 <br />Cancels Second Revised Sheet No. 9.045 <br />(Continued from Sheet No. 9.044) <br />17.63 Changes in Environmental and Governmental Regulations <br />If nes environmental and other regulatory requircmaits enacted during. the term of the Contract change FPL's full avoided cost of the unit on <br />which the Contract is based, tither party can electto have the contract reopened. <br />17.7 lntaconncction.'tVhccling Agrcanent <br />'Rte QS his eieeuted an interconnection agreement with FPI., or represents or win -ants that ithas entered into a valid anil ¢tfarccable <br />Interconnection Agreement with the utility in whose seryice territory the Facility is located, putnuant to which the QS assumes conlmctual responsibility to <br />make any tinct aU trenanissIon-rebated arrangements (including control area services) between the QS and the transnittbtg utility for delivery of the Facility's <br />capacltyand tiaergy'to FPL. <br />17.8 Techoulogy'anif Generator Capabilities <br />That. For the Iain antis Contract the,Tcclniologyand Gmtrator Capabilities ruble set forth in Section I is accurate and complete. <br />18. General Provisions <br />14.1, Project Viability <br />7o assist1PL in assessing the QS's fmanciai and technical viability, the QS diall provide the information and docimteds regnated hit Appatdix 1) <br />urssubstantiallisintilar documents, '16 the extent the documcoto apply to the type of Facililycovcal by titis.Contrad, and to the cxtent.the ducoments are <br />available. All documents to be considered by FPL must be shin -hilted al thetime this Contract is prescnted to FPL. Failure to ptoiide the following shell <br />documents mayresiiltin a detetmination.of non -viability by FPL. <br />18.2 Permits Site Control <br />The QS hereby agrees to obtain and maintain Permits which the QS is rcquirtd to obtain as a prerequisite to engaging in the activities cccifie d in <br />this Contract. QS shall also obtain and maintain Silc Control for the Tam of the Contract <br />143 Project Management <br />18.3.1 if requeaed by FPL the QS distil .submit to FPL its integrated project schedule for Fit's review within sixty calendar days from the <br />c cciuton. of tis. Contract, and a part up and inti, schedules fur the Facility at Icast sixty calaidar d)is prior to tiiarl•tip and testing of the Facility. Thew <br />schcdhlcsshill identify key licensing, pcmiinin(g.Lbnsimdionandoperatingmilciiiricdalesatidactivilim.IfregUestcdbyFPh the QSshall vibtnitprogrcc <br />:reports in a form tinisdhctoiry to FPI, every calendar _month tinlil the Capacity Delivery nate and Ffialt nutifyFPi, of any changes m rich sclin ccs within ten <br />calendar days after 3ucit changes ere determined. FPL stall have tle"right le monitor the construction. sten-bp and testing of the Facility. either on-site of off- <br />site. FPL's technical resiew' and inspections of the Facility and resulting requests if any. shall not be consuued as endorsing the design thereof or es any <br />warranty as to the safety. durability or reliability of the Facility. <br />183.2 The QS draft pmvidc I'PI, with tbc.final dcsigner's/nianutndiirer's generator capability curves, protective relay types, proposed protective <br />relay dating., main tree -lino diagratns, mineetive relay fundiuthl diagrams, arid nllcmaiing torrent acid direct-currentcicrnemgy diagnuns fur review and <br />inspection 0 FPL no later than one hundred eighty calendar days prior to the initial synchronization date. <br />18.4 Assignment. <br />lhis.Agreemcnt shall pure to the benefit of and shall he binding upon,theParties and their respective slIccessnrs arid assigns. This Agee/nail <br />shall not be accigncd or transferred by citha Andy without the prior written conSeit ofthe other Pasty, such consent to be granted or ti•ithheld in such other <br />Party'a role discretion. Any dircit or indirect chiutge of control of QS (Ocilla- voluntary or by operation or taw) shall be deemed tut assignmaht and stta11 <br />require the prier burin at ciansccut of FPL. hhil illtstatidiug lhe.furcgoing, vsther, Party stay, wittotit the cuiisad of Me Mita. Party, assign rte het:ster this <br />Agreement: (a) to 'any lender as. collateral sccurity fur obligations under,any financing documents entered into with such lender provided, QS shall be <br />responsible for FPI,'sreasonable cads and nxpmacs associated with the review, negotiation, cxeadion and delivery of any documents or information pursuant <br />to such Collateral a�cighqucnt, htelnding reasonable allomcys' fees (h) to an affiliate of such Party; 1.;!-,..A.44,4 that much affiliate's creditworthiness is equal to <br />or bettcrYhan that of such Party (and in no event leers than hivessiniait (Trade) as determined reasonably by the non•assigning or non -transferring Party and <br />provided, JaAher. that any such affiliate shall agree in writing to be bound by and to asaume the hamss and conditions hereof and any and all obligation's to the <br />n- <br />icoassignutg or nurt-eransfcrring Party arising or accruing hcrcunde Gum and atter the dale of such assumption. "Investment Grade" means BBB- or above <br />front Standard & Poor's Corporation ar Baa2 or,abovc from MoodyInvestor Smites. <br />18. Disclaimer <br />in excaning this Contract, FPi. dots nil, tior shouldit be consimal, to extend its credit ur fhmmcial tampon Inc the benefit of any third parties <br />lending money to or having other transact ions wiih etre QS nr any asmignce of This Contract. <br />(Continued on Sheet No. 9.046) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: September.13, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.