Laserfiche WebLink
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 44 <br />kTiORIQAROWER&.L.TG T..C(MANY <br />Attachment A <br />Second Revised Sheet No..16.313 <br />Cancels.Tirst ReViscd Sheet Ng...10.313 <br />APPENDIX B <br />TO THE STANDARD OFFER. CONTRACT <br />FOR THE PURCHASE OF FIRM CAPACFI AND ENERGY <br />FROM RENEWABLE FNI.RCY.FACILITIES <br />.OR QUALIFYING FACILITIES WITIiA DESIGN CAPACITY OF 100 Kw OR LESS <br />PAY FOR PERFORMANCIi PROVISIONS MONTHLY CAPACITY PAVNIENT CALCULATION <br />1. Monthly Capacity Payments (MCP) for each Monthly Billing Period shall be oiaiupiaed aceoiding to"the falldiwiing: <br />A. In the event that the Annual Capacity Billing Factor ("ACBF"), as defined below, is less than 80%, then no Monthly Capacity Payment shall be <br />due. Thetis:: <br />MCI*=0 <br />B. In* event that the ACBP:is equal to or greater that 80%.bu(Icss than 9414, then the Monthly Capacity Payment shall be calculated by using <br />the followingfoninda: <br />ACCP "' DCP x [14.4x (ACDF• — 94%)] x C.C. <br />C. In die event that the ACBE is egtml to C4 greater than 94%, then the Tenthly CapaoityPay hent stall bo calculated by using the following <br />formula: <br />MCP' DCv x CC <br />Where: <br />MCP s DlonthlyCapacity P icntindollars.. <br />BCP Base Capacity Payment in $%K\V/Month as,spccificd inFPL's Rate Schedule QS -2. <br />ce C tittcd Capacity in KW. <br />ACBF Annual Capacity Billing Factor. This factor is calealafed lasing the 12 months rolling average of the Monthly (', apacily <br />Factor. 11ris 12 month rolling average *tall be defined as the sum of the 12 consecutive Monthly C ipacity Factors <br />lireeediig the date of calculation, divided by 12. ()ming the first 12 ez nseenhve Monthly Billing Periods; cinlmeicing <br />with the first Monthly Billing Period in which Capacity payments are to be made, the, calculation of the Antal <br />Capacity Billing Factor shall be perfoniled as follows: (a) daring the first Monthly Billing Period, the Annual Capacity <br />Billing Factor shall be equal to the Monthly Capacity Factor, (h) thereafter, the calculation of the Annual Capacity <br />l3illirg Factor shall be computed by ch iding the slim of the MonOJyCapacity Factors During Oe first yeids Monthly <br />Billing Periods in wltich.Capacity payments are to be tirade by the number of Monthly Billing Periods which have <br />elapsed. This calculation shall be performed at the end of each Monthly Billing Period until enough Monthly Billing <br />Periods have elapsed 10 calculate a true 12 -ninth rolling average Amuud Cti adty Rifling Factor. Periods during <br />t 1uch the Facility has temporarily set its Committed (rapacity equal to 0 KW due to a Voice Mejcwo event pursuant to <br />$extion 16 shall be excluded from tic applicable capacity factor calculation. <br />MCF = Monthly. Capacity Factor. The sura of (i) the Nobly Factors of the non -Dispatch flours plus (ii) the Hourly <br />Factors of die Dispatch Home or the Hourly facture of the hours when FPL requested reduced deliveries pursuant to <br />Sections 8.4,6 and 8.4.3 (Reduced Delivery hour); divided by the number of hours in the Monthly Billing Period. <br />11[ NDIi = Hourly Factorofa Non -D spatch (lour. 'The energy received during the hour divided by'the Committed Capacity. <br />For pangosls of calculating the Handy Factor ofa Non -Dispatch Hour the energy received shall not exceed the <br />Committed Capacity. <br />HFDH = Hourly Factor of a Dispatch Hour or a Reduced Delivery Hour. The scheduled energy received divided by the <br />scheduled energy requested. For purposes of calculating the hourly Factor ofa Dispatch Hour or the llotrly Factor <br />ofa Reduced Delivery hour the scheduled energy received shall not exrev4 the scheduled energy requested. <br />TAI -Peal: Boars Those hours occurring April 1 through October 31 Mondays ihrolgh Fridays, from 12 noon to 9:00 p.m. excluding <br />Memorial Day, independence Day and Tabor Day; and November 1 through March 31 Mondays through Fridays <br />from 6:00 a.m. to 10:00 a.m. and 6:00 p.m. to 10:00 pout. prevailing Eastern time exdttding Thanksgiving Day, <br />Chiietmas Day and New Year's Day. FPL shall have the right to change suds On- Peak Hours by providing the QS <br />a minimumofthirty calendar days' advance notice. <br />Monthly Billing = The period beginning on the first calendar day of each calendar mon*, except that tho initial Monthly Billing <br />Period Period hall consist of the pened beginning 12:01 a.m. on the Capacity DelbVery Period Dale and ending with <br />Ule.lasteale alar day ofauch month. <br />Scheduled Energy and Dispatch Hours are as defined in Section 8.4.7 of One Standard Otter Contract. <br />Issued by; S. E. Romig; Director, Rates and Tariffs <br />Effective: August 27,201S <br />