Laserfiche WebLink
IAbor <br />$26,770.83 <br />Equipment <br />$35,954.00 <br />Asphalt <br />$26,120.02 <br />Sod <br />$8,236.20 <br />Pipe <br />$10,004.28 <br />Limerock <br />$42,115.24 <br />K & S Rip Rap <br />$13,320.00 <br />Stakes 318 0.18 <br />$57.24 <br />Testing <br />$765.00 <br />Pavement Markings <br />$972.00 <br />Miscellaneous <br />$200.00 <br />$809.60 <br />$164,514.81 <br />ENGINEERING <br />$164,514.81 <br />Survey Crew 80 hrs ® <br />$37.83 <br />$3,026.40 <br />Chief Surveyor 20 hrs ® <br />$25.30 <br />$506.00 <br />Drafting 240 hrs ® <br />$14.18 <br />$3,403.20 <br />Design 228 hrs ® <br />$26.01 <br />$5,930.28 <br />Construction <br />Stake Out 32 hrs ® <br />$25.30 <br />$809.60 <br />$13,675.48 <br />$13,675.48 <br />Sub -Total <br />$178,190.29 <br />Administration 3.017415% <br />$5,376.74 <br />Recording Fee <br />$664.00 <br />$2.00 Front Foot to be assessed to benefited <br />property owners = $18,568.74 <br />2% Tax Collector's Fee (Based on Assessment Roll Costs) <br />$371.37 <br />TOTAL $184,602.40 <br />101fin.wkl 20 -May -92 <br />